武汉二七长江大桥主塔塔机拆除技术

来源 :建筑机械化 | 被引量 : 0次 | 上传用户:tom0101
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对武汉二七长江大桥5号主塔施工用C7050型塔机在拆除过程中面临附墙杆件吊装困难、塔机降塔时其起重臂与主塔的塔身发生干涉、汽车起重机的吊装作业幅度和范围受塔身和斜拉索的影响、高空作业等难题,结合有限的作业条件,经过方案比选,提出了利用塔机自身起吊和降塔的性能并借助一台汽车起重机进行非常规拆除的方法。 In the dismantling process, the C7050 tower crane used for the construction of the main tower of No. 5 Yangtze River Bridge in Wuhan is faced with the difficulty of hoisting the wall-attached rods. When the tower crane drops the tower, its crane arm interferes with the tower of the main tower and the crane of the truck crane The scope and scope of the operation are affected by the tower and the stay cables and the problem of aerial work. Combining with the limited operating conditions, through the comparison and selection of the schemes, it is proposed to utilize the tower crane itself to lift and lower the tower and make use of a crane Dismantling method.
其他文献
目的 探讨糖尿病肾病终末期病人行血液透析发生心肌梗塞的特点及护理要点.方法 对204例糖尿病肾病终末期实施血液透析病人与同期665例其他肾病终末期行血液透析病人发生心肌
目的 探讨早期康复训练对脑卒中偏瘫病人运动功能和日常生活活动能力(ADL)的作用.方法 按脑血管病诊断标准将109例急性脑卒中偏瘫患者随机分成两组,两组均进行常规药物治疗和
目的 探讨PrinCe法肝门阻断所致的肝脏缺血再灌注损伤是否影响肝癌肝切除患者的预后.方法 回顾性分析2004年1月至2008年12月西南医院收治的315例行肝癌肝切除患者的临床资料.
对于高耸建筑机械塔式起重机来说,附着杆是其必不可少的部件。本文通过理论推导和数值分析,分别研究了三杆体系和四杆体系附着杆长度、角度等影响因素对附着杆内力的影响。为
为了解决全地面起重机塔式副臂工况下工作幅度变化问题。利用解析法求出主臂和拉板系统的结构变形,并分析其对幅度的影响,得出主臂、拉板系统对幅度变化的影响因子。使用ANSY
以自行研发设计的ZLP3000型大跨度高处作业吊篮为研究对象,依据参数化设计思想,利用APDL语言对不同吊点位置及不同模块化组合的悬吊平台进行参数化建模,以VB平台编制接口文件
通过使用柴油加热器对发动机冷却液、电池组、液压油及柴油加热,实现-40℃高寒条件下挖掘机顺利启动并快速投入使用。同时,通过独立气暖加热器加热驾驶室给操作者增加舒适性
采用PLC变频器构成两级控制系统,以闭环矢量控制的方法控制多电机同步为例进行了实验和模拟,试验和运行表明本系统的控制精度完全满足盾构驱动刀盘的控制要求。
以广州地铁7号线广州南站-大洲车辆出入段区间为例,从地质水文因素、盾构掘进参数、管片原因、注浆工艺等因素分析了盾构隧道渗漏的原因,阐述了解决思路和防治施工措施,为泥水盾