钨矿整个经济工作的效果和选厂不停歇的工作都有赖于采矿工作的正确领导和有组织有节奏的工作,这就要求负责矿山开采工作生产技术领导的总工程师以及各级助手对此都应有明确的认识,并注意到采矿工作的特殊条件和复什性,使一切工作都服从于正确的生产组织及技术领导,从而保证工作面不停地工作,并从质量和数量上保证计划的采矿量和运到选矿厂的出窿矿石。因此,钨矿总工程师在矿山开采方面要能做到:在矿山整体设计的基础上,组织编制矿山长远规划和年度矿山工作计划,正确拟定并全力贯彻实施矿山计划的技术措施;严格执行采矿技
The effect of the entire economic work on tungsten mines and the non-stop working of the mills depend on the correct leadership of the mining work and the organized and rhythmic work which requires that the chief engineer in charge of production technology and the assistants at all levels Should have a clear understanding and take note of the special conditions and complexities of the mining work so that all work is subject to the correct production organization and technical leadership so as to ensure that the work surface can keep working and ensure the quality and quantity of the plan Of the amount of ore shipped to ore dressing plant and out of ore. Therefore, the chief tungsten mine engineer should be able to do the following in mine exploitation: on the basis of the overall design of the mine, organize the preparation of the long-term mine planning and annual mine work plan, properly formulate and fully implement the technical measures for the implementation of the mine plan, and strictly implement the mining technology