论文部分内容阅读
The purpose of this article is to show a metallographic analysis of an underground pipeline taken out of operation upon failure. The pipeline had an 8.89 cm (3.5”) diameter and a 7 mm thickness. The study was based on a 45 cm long pipe sample, visibly and