论文部分内容阅读
【西德《原子经济》1980年6月报道】日本通产省在1980年3月发表了一份有关各种发电厂的建造和发电成本的调查报告。这是根据日本八家电力供应公司的调查数据撰写的。以1979年投入运行的为例,水力发电厂的比成本为425,000日元/千瓦,烧油电厂为105,000日元/千瓦,烧煤电厂为154,000日元/千瓦,烧天然气的电厂为145,000日元/千瓦,核电站为170,000日元/千瓦。水力发电厂的发电成本为15.60日元/度电,燃油电厂为16.0日元/度电,烧煤电
[West Atomic Economy, June 1980] In Japan in March 1980, the Ministry of International Trade and Industry published an investigation report on the costs of construction and power generation for various power plants. This is based on survey data from eight Japanese power supply companies. Take the operation in 1979 as an example. The specific cost of the hydroelectric power plant is 425,000 yen/kW, that of the oil-fired power plant is 105,000 yen/kW, that of the coal-fired power plant is 154,000 yen/kW, and that of the natural gas-fired power plant is 145,000 yen / kilowatt, nuclear power station is 170,000 yen/kilowatt. Hydroelectric power generation costs 15.60 yen/kWh, and fuel power plants 16.0 yen/kWh, coal-fired electricity