论文部分内容阅读
介绍了灌河大桥索塔承台大体积混凝土施工的技术与工艺、温度控制标准和温控措施,阐述了温控监测的内容、方法和效果。结果表明,工程中采用的工艺和温度控制措施合理,效果显著;温控监测结果准确,实测值与计算值有较好的相符性,为温度控制提供了可靠信息,同时也为工程的质量评估提供了可靠依据。
The technology and process, temperature control standard and temperature control measures for the construction of large-volume concrete of the tower cap of Caledonian Bridge are introduced. The contents, methods and effects of temperature monitoring are expounded. The results show that the process and temperature control measures adopted in the project are reasonable and the results are obvious. The results of temperature control and monitoring are accurate, and the measured values and calculated values are in good agreement. The results provide reliable information for temperature control and also provide an assessment of the quality of the project Provide a reliable basis.