论文部分内容阅读
介绍了长沙湘江二大桥东接线高路堤软基的几种主要施工工艺和边坡稳定措施。并通过1年后的运营效果,剖析了成功的经验和失败的教训。
Some main construction techniques and slope stability measures for soft foundation of high embankment of the Second East Bridge of Xiangjiang River in Changsha are introduced. And through the operation effect after one year, it analyzes the successful experience and the lesson of failure.