四、电气设备的监视和控制这部分项目还没有开始进行工作,现将计划方案介绍如下。井下6600伏主开关装置和1100伏及550伏的分段开关箱将由地面进行监视和
Fourth, the monitoring and control of electrical equipment This part of the project has not yet begun to work, the plan is now introduced as follows. Underground 6600 volt main switchgear and 1100 volt and 550 volt sectional switch boxes will be monitored by the ground and