论文部分内容阅读
本文结合西安地铁二号线南延段地下车站、区间隧道采用的施工方法,对地下车站的几种施工方法以及不同区间隧道所采用明挖法、矿山法、盾构法进行施工的适应性进行分析。
In this paper, the construction methods of the underground stations and tunnels in the Nanyan section of Xi’an Metro Line 2 are used to adapt the construction methods of underground stations and the excavation methods adopted by different sections of tunnels, mining method and shield method analysis.