摘要:工程监理是工程建设的基础工作,在工程建设技术控制中发挥着越来越大的作用。工程监理贯穿整个工程建设中,其工作核心在于工程质量监督和技术控制。如何加强工程监理在工程建设质量监督和技术控制中的作用,是做好工程监理工作的重点内容。本文通过对工程监理的介绍,结合佛山国际商业中心二期工程基坑支护工程,从施工准备阶段、施工阶段及竣工验收阶段等三个阶段对程监理质量监督和技术控制途径与方法进行探讨,提出具体的质量监督和技术控制方法,对其他工程监理具有一定的参考和借鉴价值。
关键词:工程监理;技术控制;基坑支护工程;途径方法
Abstract: Project management is a basic work of engineering construction and plays a more and more important role in the technical control in engineering construction. Engineering supervision is throughout the project, its core is the construction quality supervision and technical control. This paper is based on the engineering supervision and other two stages to explore ways and means of project supervision quality supervision and technical control and puts forward the quality supervision, which has a certain reference and the reference value to other engineering supervision.
Keywords: project management; control technology; foundation pit engineering; approach
中圖分类号:TV551.4文献标识码:A文章编号:
工程监理的主要任务就是采取有效的组织管理措施,对建设工程的投资、进度和质量等三大目标实施动态控制,确保三大目标得到合理的实现。其中对工程技术控制是保证施工质量的重要环节,也是监理工作的核心内容之一,同时,也是当前情况下,业主对监理工作的最基本的要求。因此,抓好工程技术控制是重中之重,是监理工作的生命线,如何有效地实施工程监理工作,减少和避免安全事故的发生,进行工程监理技术控制,是当前监理行业研究的热点。本文以佛山国际商业中心二期基坑支护工程施工项目为例探讨工程监理的技术控制问题。
一、佛山国际商业中心二期基坑支护工程施工项目项目介绍
佛山国际商业中心二期基坑支护工程施工项目位于佛山市禅城区城门头路18号,基坑支护工程场地北侧距建筑红线约6.1m处为已建居民住宅楼(3~7F不等),西侧距建筑红线约8m处为已建居民住宅楼(3~7F不等),较远处为汾江中路,东侧紧邻建设二街,南侧为佛山国际商业中心一期已建场地(商业中心楼高31F)毗邻城门头路,场地交通便利。
基坑开挖标高-20.2m。基坑开挖深度20.2m,基坑开挖边线(基坑内边线)周长约235m,面积约3118㎡,采用地下连续墙加三道钢筋混凝土内撑支护的总体支护设计。基坑支护结构设计安全等级为一级,其基坑重要性系数γ=1.1。
二、工程监理技术控制的内涵
工程监理中的质量监督和技术控制是指为达到工程项目质量要求所采取的作业技术和活动。其质量要求主要表现为工程合同、设计文件、规范规定的质量标准。因此,工程监理技术控制包括了事前控制、事中控制、事后控制三个阶段,即施工准备阶段的技术控制、施工阶段的技术控制、竣工验收阶段的技术控制,下面本文将以佛山国际商业中心二期工程基坑支护工程在施工的三个阶段具体的技术控制的方法和途径。
三、施工准备阶段的技术控制途径与方法
监理在工程施工前的技术控制主要体现在规范项目的施工准备,包括施工环境勘探准备以及其他技术准备。如:佛山国际商业中心二期工程基坑支护工程在施工前环境勘探准备主要是监督对深基坑的场地环境和水文地质的勘探,保证施工的工作环境和施工环境,确保深基坑施工正常进行。这是深基坑项目技术能够达到最大发挥的前提和基础。
深基坑项目的技术准备主要体现在,一、会同有关单位搞好现场交接工作,详细复核有关红线点,布设现场临时用电线路、临时用水线路和其它的临时设施。二、熟悉和会审施工图纸,组织工程技术人员认真学习施工图纸,了解施工图纸设计意图,全面熟悉和掌握施工图纸的全部内容。提出改进设计便于施工的合理化建议。三、编制施工组织设计创优施工方案,阐明施工工艺和主要项目的施工方法,劳动力组织和工程进度、质量和安全的保证措施,收集已施工的各种经验性的资料,针对本工程的特点和难点,编制切实可行的分项施工方案。四、技术交底,在工程开工前,工程技术负责人分别组织参加施工的人员进行技术交底,技术交底采取“分层三级”制,即技术负责人组织各分项技术人员向班组长和质检员交底,班组长和质检员接受交底后要认真反复地学习。五、编制施工图预算,掌握熟悉施工图纸和有关技术业务资料,包括施工图纸、设计说明书、标准详图、施工定额、施工组织设计等。计算工程量,按分项分部计算,以满足施工时对各部位工程量度需要,作好劳动力、材料、机械台班等需用量分析。
四、施工阶段的技术控制途径与方法
工程施工过程技术控制,是监理工程师技术控制的重点工作。监理工程师在施工阶段进行技术控制主要施工工程的技术审核及进行现场技术监督。
第一,审核有关技术文件、报告或报表。通过对上述文件所反映的信息进行处理,是工程项目进行技术控制的重要手段。如:佛山国际商业中心二期工程基坑支护工程在深基坑工程技术监测方面主要有一下几个方面:
第二,现场监督工程项目的技术。这是整个监理活动中最重要的环节,通过对项目的各个环节技术控制,反应深基坑的技术规范,保证深基坑项目的顺利完成,在佛山国际商业中心二期工程基坑支护工程中现场的技术控制主要有:第一,地下连体墙的施工,设备进场安装,构筑钢筋砼导墙和单元槽段划分,成槽护壁泥浆池设置和拌制(及泥浆循环处理),然后进行液压抓斗成槽作业,土方凉晒装车外运,清底换浆清孔(及清刷槽段接头),再进行吊放钢筋笼与接头管(钢筋笼制作),布设混凝土浇注导管进行水下浇注连续墙混凝土,顶拔接头管,最后冲洗混凝土导管,清理现场并进行下一单元槽段成槽作业。第二,冠梁、腰梁、内支撑梁的施工,三道钢筋混凝土内支撑施工是深基坑工程的难点和重点,主要技术流程是放线定位→模板施工→钢筋绑扎→浇筑混凝土→养护→拆模。在该项目中主要有,钢筋工程,模板工程,混凝土工程及脚手架工程,所以在工程监理的现场控制中要注意这几个方面。第三,连续墙重点方案技术控制,连续墙是施工的重点内容,监理工作主要加强对地下连续墙防渗,连续墙成槽以及连续墙应急措施的监督,在防渗施工中,加强结构砼防渗施工的技术监管,连续墙施工中主要遇到的问题是,槽孔倾斜或歪曲、钢筋笼难以放入槽孔内或上浮、夹层、连续墙垂直度控制。在监督控制中需要重点注意。
五、竣工验收阶段的质量控制途径与方法
在工程的竣工验收阶段,监理单位应根据工程完成情况,按国家标准《工程施工质量验收规范》的质量评定标准和办法,对完成的单元、分项、分部工程、单位工程进行检查验收。以佛山国际商业中心二期工程基坑支护工程为例,在基坑支护工程结束时要加强对主控项目的质量抽样检查,如连续墙施工以及冠梁、腰梁、内支撑梁的施工,并作完整的项目检测记录。对于存在问题的工程项目要督促进行整改,并提出整改意见,在工程整改之后还应该加强对整修后的工程项目进行检查验收,保证工程的质量。
总结:
工程建设中,工程的技术控制是工程监理的重要工作,也是工程监理的首要责任。工程监理只有充分发挥在工程的准备阶段,工程施工阶段和工程竣工验收阶段的作用,把好工程技术关,加强技术控制,使得技术控制贯穿整个工程建设中,才能做好工程监理工作,确保工程技术,保证工程质量。
参考文献:
[1]赵忠责.谈工程监理质量控制方法的运用[J]. 工程管理,2009(31)
[2]张桂林.施工阶段监理工程师如何做好质量控制[J]. 山西建筑,2010( 5)
[3]俞平飞.浅述建设工程监理制度深化[J]. 商场现代化,2005(2)
关键词:工程监理;技术控制;基坑支护工程;途径方法
Abstract: Project management is a basic work of engineering construction and plays a more and more important role in the technical control in engineering construction. Engineering supervision is throughout the project, its core is the construction quality supervision and technical control. This paper is based on the engineering supervision and other two stages to explore ways and means of project supervision quality supervision and technical control and puts forward the quality supervision, which has a certain reference and the reference value to other engineering supervision.
Keywords: project management; control technology; foundation pit engineering; approach
中圖分类号:TV551.4文献标识码:A文章编号:
工程监理的主要任务就是采取有效的组织管理措施,对建设工程的投资、进度和质量等三大目标实施动态控制,确保三大目标得到合理的实现。其中对工程技术控制是保证施工质量的重要环节,也是监理工作的核心内容之一,同时,也是当前情况下,业主对监理工作的最基本的要求。因此,抓好工程技术控制是重中之重,是监理工作的生命线,如何有效地实施工程监理工作,减少和避免安全事故的发生,进行工程监理技术控制,是当前监理行业研究的热点。本文以佛山国际商业中心二期基坑支护工程施工项目为例探讨工程监理的技术控制问题。
一、佛山国际商业中心二期基坑支护工程施工项目项目介绍
佛山国际商业中心二期基坑支护工程施工项目位于佛山市禅城区城门头路18号,基坑支护工程场地北侧距建筑红线约6.1m处为已建居民住宅楼(3~7F不等),西侧距建筑红线约8m处为已建居民住宅楼(3~7F不等),较远处为汾江中路,东侧紧邻建设二街,南侧为佛山国际商业中心一期已建场地(商业中心楼高31F)毗邻城门头路,场地交通便利。
基坑开挖标高-20.2m。基坑开挖深度20.2m,基坑开挖边线(基坑内边线)周长约235m,面积约3118㎡,采用地下连续墙加三道钢筋混凝土内撑支护的总体支护设计。基坑支护结构设计安全等级为一级,其基坑重要性系数γ=1.1。
二、工程监理技术控制的内涵
工程监理中的质量监督和技术控制是指为达到工程项目质量要求所采取的作业技术和活动。其质量要求主要表现为工程合同、设计文件、规范规定的质量标准。因此,工程监理技术控制包括了事前控制、事中控制、事后控制三个阶段,即施工准备阶段的技术控制、施工阶段的技术控制、竣工验收阶段的技术控制,下面本文将以佛山国际商业中心二期工程基坑支护工程在施工的三个阶段具体的技术控制的方法和途径。
三、施工准备阶段的技术控制途径与方法
监理在工程施工前的技术控制主要体现在规范项目的施工准备,包括施工环境勘探准备以及其他技术准备。如:佛山国际商业中心二期工程基坑支护工程在施工前环境勘探准备主要是监督对深基坑的场地环境和水文地质的勘探,保证施工的工作环境和施工环境,确保深基坑施工正常进行。这是深基坑项目技术能够达到最大发挥的前提和基础。
深基坑项目的技术准备主要体现在,一、会同有关单位搞好现场交接工作,详细复核有关红线点,布设现场临时用电线路、临时用水线路和其它的临时设施。二、熟悉和会审施工图纸,组织工程技术人员认真学习施工图纸,了解施工图纸设计意图,全面熟悉和掌握施工图纸的全部内容。提出改进设计便于施工的合理化建议。三、编制施工组织设计创优施工方案,阐明施工工艺和主要项目的施工方法,劳动力组织和工程进度、质量和安全的保证措施,收集已施工的各种经验性的资料,针对本工程的特点和难点,编制切实可行的分项施工方案。四、技术交底,在工程开工前,工程技术负责人分别组织参加施工的人员进行技术交底,技术交底采取“分层三级”制,即技术负责人组织各分项技术人员向班组长和质检员交底,班组长和质检员接受交底后要认真反复地学习。五、编制施工图预算,掌握熟悉施工图纸和有关技术业务资料,包括施工图纸、设计说明书、标准详图、施工定额、施工组织设计等。计算工程量,按分项分部计算,以满足施工时对各部位工程量度需要,作好劳动力、材料、机械台班等需用量分析。
四、施工阶段的技术控制途径与方法
工程施工过程技术控制,是监理工程师技术控制的重点工作。监理工程师在施工阶段进行技术控制主要施工工程的技术审核及进行现场技术监督。
第一,审核有关技术文件、报告或报表。通过对上述文件所反映的信息进行处理,是工程项目进行技术控制的重要手段。如:佛山国际商业中心二期工程基坑支护工程在深基坑工程技术监测方面主要有一下几个方面:
第二,现场监督工程项目的技术。这是整个监理活动中最重要的环节,通过对项目的各个环节技术控制,反应深基坑的技术规范,保证深基坑项目的顺利完成,在佛山国际商业中心二期工程基坑支护工程中现场的技术控制主要有:第一,地下连体墙的施工,设备进场安装,构筑钢筋砼导墙和单元槽段划分,成槽护壁泥浆池设置和拌制(及泥浆循环处理),然后进行液压抓斗成槽作业,土方凉晒装车外运,清底换浆清孔(及清刷槽段接头),再进行吊放钢筋笼与接头管(钢筋笼制作),布设混凝土浇注导管进行水下浇注连续墙混凝土,顶拔接头管,最后冲洗混凝土导管,清理现场并进行下一单元槽段成槽作业。第二,冠梁、腰梁、内支撑梁的施工,三道钢筋混凝土内支撑施工是深基坑工程的难点和重点,主要技术流程是放线定位→模板施工→钢筋绑扎→浇筑混凝土→养护→拆模。在该项目中主要有,钢筋工程,模板工程,混凝土工程及脚手架工程,所以在工程监理的现场控制中要注意这几个方面。第三,连续墙重点方案技术控制,连续墙是施工的重点内容,监理工作主要加强对地下连续墙防渗,连续墙成槽以及连续墙应急措施的监督,在防渗施工中,加强结构砼防渗施工的技术监管,连续墙施工中主要遇到的问题是,槽孔倾斜或歪曲、钢筋笼难以放入槽孔内或上浮、夹层、连续墙垂直度控制。在监督控制中需要重点注意。
五、竣工验收阶段的质量控制途径与方法
在工程的竣工验收阶段,监理单位应根据工程完成情况,按国家标准《工程施工质量验收规范》的质量评定标准和办法,对完成的单元、分项、分部工程、单位工程进行检查验收。以佛山国际商业中心二期工程基坑支护工程为例,在基坑支护工程结束时要加强对主控项目的质量抽样检查,如连续墙施工以及冠梁、腰梁、内支撑梁的施工,并作完整的项目检测记录。对于存在问题的工程项目要督促进行整改,并提出整改意见,在工程整改之后还应该加强对整修后的工程项目进行检查验收,保证工程的质量。
总结:
工程建设中,工程的技术控制是工程监理的重要工作,也是工程监理的首要责任。工程监理只有充分发挥在工程的准备阶段,工程施工阶段和工程竣工验收阶段的作用,把好工程技术关,加强技术控制,使得技术控制贯穿整个工程建设中,才能做好工程监理工作,确保工程技术,保证工程质量。