论文部分内容阅读
目前,物探项目精细化采集施工方法普遍流行,动用的采集设备越来越多,用工人数越来越大,而物探采集工程造价受市场竞争和降低勘探成本的制约并不能同比例提高,造价管理的压力激增。在这种背景下,物探造价管理只有以主动控制为前提,对物探项目造价进行全过程的管理与控制,才能更有效地提高效益。本文结合工程造价的相关理论与物探行业的特点,经过初步的分析,提出了为实现效益最大化目标,如何更好的对物探项目造价进行管控的建议和措施。
At present, geophysical projects are widely used in meticulous collection and construction methods, more and more collection equipments are used and more and more workers are employed. However, geophysical acquisition project cost can not be increased in proportion with the competition due to market competition and exploration cost reduction. Cost management The pressure surge. Under this kind of background, the geophysical cost management can only improve the efficiency more effectively only when the active control is the premise, and the whole process of geophysical project cost management and control. Based on the related theory of engineering cost and the characteristics of geophysical prospecting industry, this paper puts forward some suggestions and measures for how to realize the goal of maximizing benefit and how to better control the cost of geophysical exploration project through the preliminary analysis.