论文部分内容阅读
三峡水利枢纽工程担负着我国中部地区防洪、发电、航运的重大使命。为尽早发挥工程效益,三峡工程采取了分期蓄水的方案,即要经历围堰发电、初期运行、正常运行三个阶段,目前工程正处于围堰发电期。三峡水电站(电厂)是未来全国各大电网的联网中心,其安全稳定运行对整个电力系统乃至国民经济的发展起着举足轻重的作用。
The Three Gorges Project is responsible for the flood control, power generation and shipping in the central region of China. In order to exert engineering benefits as early as possible, the Three Gorges Project adopted a plan of staging water storage, that is, going through three phases of cofferdam power generation, initial operation and normal operation. Currently, the project is in a cofferdam power generation period. The Three Gorges Hydropower Station (power plant) is the networking center of major power grids in the future. Its safe and stable operation plays an important role in the development of the entire power system and even the national economy.