龙羊峡水电站缆机基础梁扭转计算

来源 :水力发电 | 被引量 : 0次 | 上传用户:ckxworkman
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在计算缆机的各种条形基础时,往往会遇到弹性地基梁的扭转问题。但在国内某些大型工程施工中,由于忽视了对这一问题的研究,在缆机基础内未设置受扭钢筋,致使缆机投入运行后基础梁两侧的混凝土出现较多裂纹,影响缆机的安全运行。因此,我们在龙羊峡高塔 In calculating the various strip foundation of the cable machine, the problem of torsion of the elastic foundation beam is often encountered. However, in some large-scale construction projects in China, due to the neglect of the research on this issue, no twisted steel bars are provided in the foundation of the cable machine, resulting in more cracks in the concrete on both sides of the foundation beam after the cable machine is put into operation, Machine safe operation. Therefore, we are in Longyang Gap Tower
其他文献
AIM:To evaluate the effect of human telomerase reversetranscriptase(hTERT)gene antisense oligodeoxynucleotide(As-ODN)on telomerase activity and cell apoptosis
在水利水电工程地质勘察中,由于推广金刚石小口径钻探,很需要有能直接观察Φ56毫米钻孔孔壁地质现象的钻孔电视设备。为满足这一需求,长办物探队与天津大学继续协作,在Φ91
鲁班水库位于四川省三台县,是都江堰灌区干渠上一座能蓄水2.78亿m~3的囤蓄水库。其主坝为钢筋混凝土防渗面板干砌条石坝,坝高68m,坝长315m,为目前我国已建同类型坝最高的一
概述新安江电站建成于1960年4月,大坝为混凝土宽缝重力坝。水力枢纽有大坝、厂房、溢洪道等组成,厂房位于溢流坝后为厂顶溢流式。泄洪时高速水流流经溢流坝面,过厂房顶,再由
据苏联《水工建设》杂志报道,在苏联水电站机组机械设备故障中,有60%出自推力轴承。随着现代水轮发电机组单机容量的增大,保证机组可靠性问题变得特别重要,因而对推力轴承的
请下载后查看,本文暂不支持在线获取查看简介。垂体腺瘤显微手术中微血管保护和视神经功能保留$贵阳医学院附属医院神经外科!550002@陈益民$贵阳医学院附属医院神经外科!55000
AIM:To investigate the influence of peroxisome proliferator-activated receptor γ(PPARγ)ligand,15-deoxy-△12,14-prostaglandin J_2(15dPGJ_2)on the proliferatio
据初步统计,我国大、中型水电工程平均每米~3混凝土的水泥用量(包括运输、保管、施工损耗和灌浆),在50年代为200~230公斤,其中新安江、新丰江和西津等水电站均低于200公斤;到
掘进机直径陇润长度日进尺月进尺年份工租名称所在国家(米)(米) 196.1.64~19651966~19611968~1.1二1.10~1盯吕 19,8 19791.1.~198公1910~19781979~1980 1985~Man少级巴集地铁
伶仃洋每年渲泄珠江50%以上的径流,泥沙3000多万吨。当珠江河水进入伶仃洋后,流速减缓,在河海交互作用下,产生絮凝作用,形成三滩(东滩、中滩与西滩)和两槽(伶仃水道与矾石水