北京HI-13串列加速器一直保持良好的运行状态。近几年,根据设备的运行状态和实验室的发展需求,陆续完成了注入器升级改造、能量重新刻度、分析磁铁电源改造、主真空系统改造等技术改造工作。新建两条专用实验束流线,正在进行辐射防护系统的改造。本文介绍串列加速器的运行情况,重点阐述技术改造的完成或进展情况。
Beijing HI-13 Tandem Accelerator has maintained a good state of operation. In recent years, according to the operation status of the equipment and the development needs of the laboratory, we have successively completed the technical revamping work such as upgrading and rebuilding of the injector, re-calibration of the energy, analyzing the transformation of the magnet power and the renovation of the main vacuum system. New two dedicated experimental beam streamline, ongoing radiation protection system transformation. This article describes the operation of tandem accelerator, focusing on the completion of technological transformation or progress.