苏联在动力燃料综合应用发展中,其中一个重要的任务是掌握喀山-阿钦斯克煤和以它们为基地将建立一系列大容量的800MW动力机组的国营地区电厂。首先将安装П-67锅炉。喀山-阿钦斯克煤具有强烈的结渣和污染的特性,所以在П-67锅炉的结构中已考虑了新的解决方案,包括采用膜式省煤器。在特殊的运行条件下,膜式省煤器试验结构的研究是为掌握喀山-阿钦斯克煤在П-67锅炉中的燃烧,以确定总的运行工况。这
One of the important tasks of the Soviet Union in the development of integrated power and fuel utilization is to master the Kazan Achinsk coal and the state-owned regional power plants on which they will build a series of large-capacity 800 MW power units. First install the П-67 boiler. Kazan-Achingsk coal has strong slagging and contamination characteristics, so new solutions have been considered in the structure of the П-67 boiler, including the use of membrane economizers. Under special operating conditions, the study of the membrane economizer test structure was conducted to determine the total operating conditions for the purpose of grasping the combustion of the Kazan-Aqinsk coal in the П-67 boiler. This