论文部分内容阅读
本文通过施工阶段设备材料的复核选型,可优化设备参数,选取适用设备材料,减少初投资及后期运行费用;对专业施工图进行深化,可发现设计中的不明确事项、不合理的缺陷和漏洞,完善系统使用功能;绘制综合管线图,避免交叉重叠、碰撞、返工,确定各管线的标高和定位,为设施、管线施工设置共用支架、样板引路工程实施提供图纸依据,提供材料计划编制、工程量统计依据图,优化空间布局,提高使用净空高度,使管线布置更加合理、美观。
Through the review and selection of equipment materials during the construction phase, the equipment parameters can be optimized, the applicable equipment materials can be selected, and the initial investment and post-operation costs can be reduced. Deepening the professional construction drawings can find the uncertainties in the design, unreasonable defects and Loopholes, and improve the function of the system; Draw a comprehensive pipeline diagram to avoid cross-overlap, collision, rework, determine the elevation and positioning of the pipeline for the installation of facilities, construction of the pipeline shared support, guide the implementation of the model to provide a blueprint to provide material planning, According to the volume of statistics based on plans to optimize the layout of space, improve the use of headroom, pipeline layout more reasonable and beautiful.