随着经济的快速发展,地铁建设轨道工程也在不断的进行,在进行施工中总是需要协调好各方面的关系,其中包括土建、通信、信号、供电和风水电安装等,有效的进行协调与配合管理可以更好的促进工程的顺利完工。本文从铺轨前与铺轨中两个方面对现场协调与配合管理进行了分析,为今后地铁轨道工程的开展提供帮助。
With the rapid economic development, the track construction of metro construction is also ongoing. In the course of construction, there is always a need to coordinate various aspects of the construction, including civil works, communications, signaling, power supply and feng shui hydropower installation so as to effectively coordinate and With the management can better promote the successful completion of the project. This article analyzes the on-site coordination and cooperation management from two aspects of pre-laying and laying track, which will help the future development of subway track engineering.