摘要:随着我国在工程建设领域全面推行建设监理制度,建设监理制作为新体制中的一个重要组成部分,逐步发挥十分重要的保证作用。完善了工程建设管理模式,规范了工程建设程序,强化了工程建设过程管理和控制,使得工程建设的速度、质量、管理以及经济效益和社会效益等都得到了明显的提高。监理单位作为建筑市场的三大主体之一,已成为建筑市场技术服务体系的主体。岩土工程监理,既是岩土工程重要的不可缺少的组成部分.同时又是建设监理的重要组成部分为此,本文试从建筑 工程中岩土工程专门监理的技术、方法等角度进行初步研究、探讨,以期对强化和规范建筑工程岩土工程专门监理起到有益的作用。
关键词:岩土工程 ;施工监理;技术标准
Abstract: along with the engineering construction field in the full implementation of the construction supervision system, construction supervision system as the new system is an important part, and gradually play an important role of the guarantee. Improve the management of engineering construction mode, regulate the engineering construction procedure, strengthened the project construction process management and control, makes the construction of the speed, quality, management and economic benefits and social benefits, which have been significantly improved. Supervision unit, as in the construction market of three big one of the main body, the construction market has become the subject of technical service system. The geotechnical engineering supervision, is not only an important geotechnical engineering the indispensable part. And at the same time, construction supervision is an important part of this, this paper tries to architectural engineering of geotechnical engineering supervision of techniques, methods, special Angle of preliminary research, study, in order to strengthen and standardize construction engineering geotechnical engineering special supervision have beneficial effects.
Keywords: geotechnical engineering; Construction supervision; Technical standard
中圖分类号: U415 文献标识码:A 文章编号:
一、岩土工程监理发展现状和存在的问题
在我国,岩土工程监理是在建设监理工作的开展过程中涉及岩土工程专业问题时而展开起来的,起步较晚,迄今为止,国内学者对其研究较少,尚未形成专门针对岩土监理的理论和方法,监理工作尚未全面开展,已开展的也仅仅是进行岩土工程的施工监理,对岩土工程勘察和设计基本上未进行监理。
(一)当前岩土工程监理有关专门理论内容概述
通过查阅有关资料文献和大量工程实例调查,结合对岩土工程监理实践的分析、总结,对目前有关岩土工程监理的理论内容、监理方法进行如下概略归纳,并对当前岩土工程监理中存在的问题加以分析。
1、岩土工程监理的概念
岩土工程监理亦称岩土工程咨询(Geotechnical Engineering Supervision),可理解为:依照法律、法规和技术标准、规范,综合运用组织、技术、经济、合同措施,对岩土工程工作参与者的行为及其责权利进行必要的协调和约束,保证岩土工程工作顺利进行,以取得质量、工期和投资的好、快、省。
2、岩土工程监理的业务范围
①在工程内容上包括:岩土工程勘察监理,岩土工程设计监理,岩土工程监测监理,岩土工程施工监理。
②在工程对象上包括:房屋建筑岩土工程监理,地下隧道、隧洞、人防岩土工程监理,铁路等。
③在岩土工程施工方法上包括:换(填)土处理施工监理,土桩与灰土桩施工监理,石灰施工监理等。
3、岩土工程监理的基本特点
岩土工程师研究和解决问题的主要对象通常是地面以下的部分,主要是地基基础、边坡与滑坡的治理等以及地下工程,并且为地面以上部分的工程结构服务,与地面结构的建设监理相比,岩土工程监理主要有以下特点:
① 隐蔽性,②复杂性③风险性④时效性, ⑤独立性,⑥综合性
4、岩土工程监理工作的基本准则
①责权一致 ②总监负责制 ③监理回避 ④实时监控 ⑤严格控制 ⑥统筹全局 ⑦热情服务
(二)当前岩土工程监理工作实践中存在的问题
1、岩土工程监理机构和专业监理人员缺乏
2、岩土工程监理介入的工程阶段 ,如何建立有效的监理介入机制,真正实现对岩土工程勘察、设计和施工的全面监理,是一个需要深入探索的课题。
3、岩土工程监理的控制和管理,由于岩土工程有其特殊性和复杂性, 对岩土工程的监理还应有特殊要求。
二、岩土工程监理技术方法的探讨和实施
首先应符合工程监理理论的要求,即:必须按照监理规范的规定,进行质量、进度、投资控制和信息管理、合同管理、组织协调。同时,又必须针对工程的岩土工程特点,通过组织、经济、技术、合同等多方面手段,来制定其“三控两管一协调"的具体监理措施。
(一)最大限度弥补缺失勘察监理的缺陷
基于对勘察工作及其成果重要性的认识,尤其针对本工程施工要求的特殊性,监理部对勘察成果的质量极为重视,必须保证其准确性和可靠性。为此,监理项目部开展工作后,不仅按常规立即熟悉和了解岩土工程勘察报告和抽水试验报告,而且,马上组织相关监理人员进行了现场踏勘、广泛收集了解区域地质资料,对勘察报告和抽水试验报告做细致的审核分析。
(二)监理工作尽量向设计延伸
本工程桩基设计的突出特点是桩长不确定,而是由桩端入岩长度控制,并且根据最终桩长的不同,桩端入岩长度要求不同(如:当桩长≥19m时,桩端进 入持力层深度保证大于2000ram;当桩长<19m时,桩端进入持力层深度保证大于3200mm),这就要求每支桩的桩长必须根据现场桩孔钻进情况而定。因而监理部尽量将监理工作向设计延伸,加强与设计单位的联系和沟通,监控设计桩长的最终确定。在施工过程中发现局部地段桩孔钻进深度已超过40m,仍没有达到持力层中风化岩面,于是及时向设计单位提出.设计单位进一步对上部结构荷载情况和桩基承载力要求进行核算.提出调整设计为:在保证桩长大于28 m 时,桩端选不到第(8)层者,可以在第(7)层闪长岩强肛l化岩作桩端持力层,其单桩承载力设计值为38001_N,保证了桩基设计的合理。由于基坑支护和降水设计由专项工程承包单位完成,监理部对其设计计算进行细致地审核,提出一系列改进意见,实施后,经基坑开挖验证,基坑支护和降水达到了良好的效果。
(三)施工监理质量控制
质量控制检查程序,质量缺陷与事故处理程序,监理试验工作程序作为质量控制程序的主线,进行控制。
(四)施工监理进度控制
岩土工程施工进度监理控制,以审批承包商编制的施工进度计划,并对己批准的进度计划的执行情况进行监督,动态掌握影响施工进度计划所有条件的变化情况,对进度计划的执行进行控制和调整为主线.
(五)施工监理投资控制
在工程施工阶段,监理工程师以计划投资额为投资控制目标值。控制内容主要是审查施工组织设计或施工方案,做好技术经济分析;在岩土工程施工投资控制中,监理工程师除做好以上工作外,其控制内容和措施必须体现岩土工程特点,具有针对性。
(六)施工监理合同管理
施工监理合同管理必须是全过程全方位的、系统的、动态的。监理合同、设计合同、施工总承包合同、桩基施工分包合同、材料设备采购合同、实验检验委托合同等相关的技术合同、运输合同、保险合同等等,是监理工作的基本依據,其中监理合同、施工合同是合同双方因工程建设而明确权利、义务、责任的协议,是监理工程师对工程项目实施监督管理的主要依据。监理项目部开展工作后,即全面收集和掌握,对表述不一致、约定不清楚等可能引起合同纠纷和造成索赔争议的内容,召集各方讨论一致,加以明确。
(七)施工监理信息管理
嵌岩灌注桩工程施工监理,信息管理极其重要。首先,全面收集各种图纸、合同、各承包单位资质、勘察和实验检验报告、施工组织设计及其他文字、数据以及各种报表、声音、图像、照片等资料信息,认真审阅掌握。编目存档。监理过程中,施工设备的布局、开工顺序和工序安排、桩位验收、钻杆垂直度控制、泥浆比重和粘度控制、沉渣测量控制、岩层判定、入岩深度和桩长控制、原材料质量和混凝土质量控制、钢筋笼长度确定和钢筋笼隐蔽工程验收、混凝土灌注过程控制、实验检验控制、中间验收和竣工验收、进度监控、投资控制、合同管理、组织协调等,无不需要及时准确的信息采集、分析、反馈和处理。
(八)施工监理组织协调
通过召开各方参加的监理专门协调会和监理例会,理顺业主、监理、总包和桩基施工专业单位之间的关系;协调各桩基施工专业单位之间的关系:合理组织施工分区,调度钻机开工顺序、开行路线、工序衔接:通过大量的组织协调工作,使工程在有多方参与管理、多家单位多台设备同时施工、多工序交叉的复杂情况下,没有发生矛盾纠纷、设备冲突干扰、工序脱节等现象,保证了工程的顺利进展。
参 考 文 献
[1]朱浮声.地基基础设计与计算[M].北京:人民交通出版社,2005.
[2]甘德福.岩土工程论文集[C].北京:地质出版社,1998.
[3]高大钊.岩土工程的回顾与前瞻[M].北京:人民交通出版社,2001.
[4]林宗元.试论岩土工程监理[J].西部探矿工程,1998,10(6):
[5]张之强.监理概论[M].北京:人民交通出版社,2000.
注:文章内所有公式及图表请用PDF形式查看。
关键词:岩土工程 ;施工监理;技术标准
Abstract: along with the engineering construction field in the full implementation of the construction supervision system, construction supervision system as the new system is an important part, and gradually play an important role of the guarantee. Improve the management of engineering construction mode, regulate the engineering construction procedure, strengthened the project construction process management and control, makes the construction of the speed, quality, management and economic benefits and social benefits, which have been significantly improved. Supervision unit, as in the construction market of three big one of the main body, the construction market has become the subject of technical service system. The geotechnical engineering supervision, is not only an important geotechnical engineering the indispensable part. And at the same time, construction supervision is an important part of this, this paper tries to architectural engineering of geotechnical engineering supervision of techniques, methods, special Angle of preliminary research, study, in order to strengthen and standardize construction engineering geotechnical engineering special supervision have beneficial effects.
Keywords: geotechnical engineering; Construction supervision; Technical standard
中圖分类号: U415 文献标识码:A 文章编号:
一、岩土工程监理发展现状和存在的问题
在我国,岩土工程监理是在建设监理工作的开展过程中涉及岩土工程专业问题时而展开起来的,起步较晚,迄今为止,国内学者对其研究较少,尚未形成专门针对岩土监理的理论和方法,监理工作尚未全面开展,已开展的也仅仅是进行岩土工程的施工监理,对岩土工程勘察和设计基本上未进行监理。
(一)当前岩土工程监理有关专门理论内容概述
通过查阅有关资料文献和大量工程实例调查,结合对岩土工程监理实践的分析、总结,对目前有关岩土工程监理的理论内容、监理方法进行如下概略归纳,并对当前岩土工程监理中存在的问题加以分析。
1、岩土工程监理的概念
岩土工程监理亦称岩土工程咨询(Geotechnical Engineering Supervision),可理解为:依照法律、法规和技术标准、规范,综合运用组织、技术、经济、合同措施,对岩土工程工作参与者的行为及其责权利进行必要的协调和约束,保证岩土工程工作顺利进行,以取得质量、工期和投资的好、快、省。
2、岩土工程监理的业务范围
①在工程内容上包括:岩土工程勘察监理,岩土工程设计监理,岩土工程监测监理,岩土工程施工监理。
②在工程对象上包括:房屋建筑岩土工程监理,地下隧道、隧洞、人防岩土工程监理,铁路等。
③在岩土工程施工方法上包括:换(填)土处理施工监理,土桩与灰土桩施工监理,石灰施工监理等。
3、岩土工程监理的基本特点
岩土工程师研究和解决问题的主要对象通常是地面以下的部分,主要是地基基础、边坡与滑坡的治理等以及地下工程,并且为地面以上部分的工程结构服务,与地面结构的建设监理相比,岩土工程监理主要有以下特点:
① 隐蔽性,②复杂性③风险性④时效性, ⑤独立性,⑥综合性
4、岩土工程监理工作的基本准则
①责权一致 ②总监负责制 ③监理回避 ④实时监控 ⑤严格控制 ⑥统筹全局 ⑦热情服务
(二)当前岩土工程监理工作实践中存在的问题
1、岩土工程监理机构和专业监理人员缺乏
2、岩土工程监理介入的工程阶段 ,如何建立有效的监理介入机制,真正实现对岩土工程勘察、设计和施工的全面监理,是一个需要深入探索的课题。
3、岩土工程监理的控制和管理,由于岩土工程有其特殊性和复杂性, 对岩土工程的监理还应有特殊要求。
二、岩土工程监理技术方法的探讨和实施
首先应符合工程监理理论的要求,即:必须按照监理规范的规定,进行质量、进度、投资控制和信息管理、合同管理、组织协调。同时,又必须针对工程的岩土工程特点,通过组织、经济、技术、合同等多方面手段,来制定其“三控两管一协调"的具体监理措施。
(一)最大限度弥补缺失勘察监理的缺陷
基于对勘察工作及其成果重要性的认识,尤其针对本工程施工要求的特殊性,监理部对勘察成果的质量极为重视,必须保证其准确性和可靠性。为此,监理项目部开展工作后,不仅按常规立即熟悉和了解岩土工程勘察报告和抽水试验报告,而且,马上组织相关监理人员进行了现场踏勘、广泛收集了解区域地质资料,对勘察报告和抽水试验报告做细致的审核分析。
(二)监理工作尽量向设计延伸
本工程桩基设计的突出特点是桩长不确定,而是由桩端入岩长度控制,并且根据最终桩长的不同,桩端入岩长度要求不同(如:当桩长≥19m时,桩端进 入持力层深度保证大于2000ram;当桩长<19m时,桩端进入持力层深度保证大于3200mm),这就要求每支桩的桩长必须根据现场桩孔钻进情况而定。因而监理部尽量将监理工作向设计延伸,加强与设计单位的联系和沟通,监控设计桩长的最终确定。在施工过程中发现局部地段桩孔钻进深度已超过40m,仍没有达到持力层中风化岩面,于是及时向设计单位提出.设计单位进一步对上部结构荷载情况和桩基承载力要求进行核算.提出调整设计为:在保证桩长大于28 m 时,桩端选不到第(8)层者,可以在第(7)层闪长岩强肛l化岩作桩端持力层,其单桩承载力设计值为38001_N,保证了桩基设计的合理。由于基坑支护和降水设计由专项工程承包单位完成,监理部对其设计计算进行细致地审核,提出一系列改进意见,实施后,经基坑开挖验证,基坑支护和降水达到了良好的效果。
(三)施工监理质量控制
质量控制检查程序,质量缺陷与事故处理程序,监理试验工作程序作为质量控制程序的主线,进行控制。
(四)施工监理进度控制
岩土工程施工进度监理控制,以审批承包商编制的施工进度计划,并对己批准的进度计划的执行情况进行监督,动态掌握影响施工进度计划所有条件的变化情况,对进度计划的执行进行控制和调整为主线.
(五)施工监理投资控制
在工程施工阶段,监理工程师以计划投资额为投资控制目标值。控制内容主要是审查施工组织设计或施工方案,做好技术经济分析;在岩土工程施工投资控制中,监理工程师除做好以上工作外,其控制内容和措施必须体现岩土工程特点,具有针对性。
(六)施工监理合同管理
施工监理合同管理必须是全过程全方位的、系统的、动态的。监理合同、设计合同、施工总承包合同、桩基施工分包合同、材料设备采购合同、实验检验委托合同等相关的技术合同、运输合同、保险合同等等,是监理工作的基本依據,其中监理合同、施工合同是合同双方因工程建设而明确权利、义务、责任的协议,是监理工程师对工程项目实施监督管理的主要依据。监理项目部开展工作后,即全面收集和掌握,对表述不一致、约定不清楚等可能引起合同纠纷和造成索赔争议的内容,召集各方讨论一致,加以明确。
(七)施工监理信息管理
嵌岩灌注桩工程施工监理,信息管理极其重要。首先,全面收集各种图纸、合同、各承包单位资质、勘察和实验检验报告、施工组织设计及其他文字、数据以及各种报表、声音、图像、照片等资料信息,认真审阅掌握。编目存档。监理过程中,施工设备的布局、开工顺序和工序安排、桩位验收、钻杆垂直度控制、泥浆比重和粘度控制、沉渣测量控制、岩层判定、入岩深度和桩长控制、原材料质量和混凝土质量控制、钢筋笼长度确定和钢筋笼隐蔽工程验收、混凝土灌注过程控制、实验检验控制、中间验收和竣工验收、进度监控、投资控制、合同管理、组织协调等,无不需要及时准确的信息采集、分析、反馈和处理。
(八)施工监理组织协调
通过召开各方参加的监理专门协调会和监理例会,理顺业主、监理、总包和桩基施工专业单位之间的关系;协调各桩基施工专业单位之间的关系:合理组织施工分区,调度钻机开工顺序、开行路线、工序衔接:通过大量的组织协调工作,使工程在有多方参与管理、多家单位多台设备同时施工、多工序交叉的复杂情况下,没有发生矛盾纠纷、设备冲突干扰、工序脱节等现象,保证了工程的顺利进展。
参 考 文 献
[1]朱浮声.地基基础设计与计算[M].北京:人民交通出版社,2005.
[2]甘德福.岩土工程论文集[C].北京:地质出版社,1998.
[3]高大钊.岩土工程的回顾与前瞻[M].北京:人民交通出版社,2001.
[4]林宗元.试论岩土工程监理[J].西部探矿工程,1998,10(6):
[5]张之强.监理概论[M].北京:人民交通出版社,2000.