论文部分内容阅读
水电工作者致力于研究评价规划的水电站和抽水蓄能电站经济效益的方法和标准。并且以费用支出最小值和用计划投入运行的火电工程(或综合工程)替代规划水电工程之系统方法作为计算的基础。该火电工程的容量能有效地参加远景电力平衡补偿。在地区国民经济的
Hydropower workers are dedicated to studying methods and standards for evaluating the economic benefits of planned hydropower stations and pumped-storage power stations. In addition, the system method of planning hydropower projects is replaced by the minimum cost and the thermal power project (or integrated project) put into operation as the basis for calculation. The capacity of the thermal power project can effectively participate in the prospective power balance compensation. In the national economy of the region