论文部分内容阅读
全国农村电网改造,拉动国民经济增长的工程已经全面启动,各地正在着手规划和勘测农村低压电网。然而怎样规划和勘测农村低压电网呢? 1 规划 1.1 规划农村低压电网的首要前提就是要具有一定的运行可靠性和灵活性,便于操作和运行维护,保证运行和检修时的安全,接线方式力求简化。在保证合理布局的前提下,逐步对现有电网实行技术改造,以提高供电可靠性和电能质量,改善电网运行水平,充分发挥现有电网和设备的潜力,节约建设资金。还要做到远近结合,逐步实现向长远目标的合理过渡,达到安全、可靠、优质、经济的目的。
The project of transforming rural power grids in China and stimulating the growth of the national economy has been started in all aspects and planning and surveying of rural low-voltage power grids are under way. However, how to plan and survey the rural low-voltage power grid? 1 Planning 1.1 The primary prerequisite for planning rural low-voltage power grids is to have certain operational reliability and flexibility, ease of operation and maintenance, to ensure safe operation and overhaul, and to simplify wiring . Under the precondition of ensuring a reasonable layout, the Company will gradually transform the existing power grids in order to improve the reliability of power supply and power quality, improve the operation level of power grids, give full play to the potential of existing power grids and equipment, and save construction funds. But also to achieve the combination of distance, and gradually achieve a reasonable long-term goal of transition to achieve safe, reliable, high quality and economic purposes.