摘要:随着我国社会主义市场经济的飞速发展,在建筑业领域的投资将会成倍增加。在这个背景下,作为工程项目投资主体的建设单位,必须认真研讨新时期工程项目管理的发展方向、发展态势和发展措施。我国建筑行业现在还处于管理比较粗放和落后的阶段。不过在新形势下,我国建筑行业正在通过量变寻求着发生质变的突破。新的建筑市场需要更加完善的竞争规则和更强大的竞争主体。因此,建设项目工程造价的优化问题就成了重中之重。
关键字:工程造价、工程造价管理、工程造价控制
Abstract: with the rapid development of socialist market economy, the construction industry field of investment will be multiplied. In this context, as the main body of investment project construction units, must be carefully discussion in the new period of the project management development direction, development trend and development measures. Construction industry in our country now is still in the management comparatively extensive and backward stage. But under the new situation, the construction industry in our country is through the quantitative change to seek a qualitative change happened the breakthrough. New construction market need more perfect competition rules and a more powerful competition subject. Therefore, the construction project engineering cost optimization problems became a top priority.
Key word: engineering cost, project cost management, project cost control
中图分类号:TU723.3文献标识码:A文章编号:
引言
随着改革的深化,投资主体向多元化发展。工程造价管理关系到投资主体和承包商的经济利益。关系到整个市场的竞争规范,建筑业劳动生产率的逐步提高以及全社会的科技水平的进步等一系列问题。而目前我国的建筑工程造价管理远远落后于建筑业的快速发展形势,工程造价管理体系中存在的许多深层次的问题严重制约着建筑业的发展。因此其改革理所当然成为建筑业改革的核心问题。中国建设工程造价管理如何改革、创新、适应社会主义市场经济发展需要、与国际惯例接轨等也就首当其冲地成为目前建筑界理论和实践的一个热点问题。
工程造价的控制是一项集管理、技术、质量、施工于一体的综合性的系统工程。因此要求各专业人员从各自的范围着手,有效控制资金投入,才能解决建设资金的需求与有限供给之间的矛盾。加强工程造价控制的重大意义就是在于合理使用人力、物力、财力等,从而取得最佳的经济效益和社会效益。
1.工程造价控制
長期以来,建设单位普遍忽视了工程建设项目前期工作阶段的造价控制,而是把重点放在施工阶段--审核施工图预算、工程结算价款。忽略了前期工作阶段作为投资控制基础的投资估算和设计概算的作用,因此,造成了概算超估算,预算超概算,结算超预算的"三超"现象。
做好方案优化是控制工程造价的关键。据国外统计资料表明,在项目前期方案优化过程中节约投资的可能性为80%左右。所以,要真正有效地控制工程造价,就应该把工作重点放在前期工作上,在完成市场研究以后,结合项目的实际情况,在满足使用要求的前提下,遵循"效益至上"的原则,进行多方案比选。这就要求设计人员必须牢固树立经济意识,克服重技术,轻经济,设计保守浪费的倾向,经济人员应有专业知识,了解设计意图,熟悉工艺技术方案,和设计人员密切配合,用动态分析方法进行多方案技术经济比较,要在降低工程造价上下功夫。通过方案优化,使工艺流程尽量简单,设备选型更加合理,从而节约大量资金。
2.其中施工阶段要做到以下几点:
2.1减少工程中的"签证工"。
2.2合理组织材料进场。
2.3控制好工程款的支付额度和进度。
3. 竣工决算阶段的工程造价控制
由于竣工结算审计是事后审计,很多问题很难发现.如设计、发包、合同签定的背景及施工中发生的细节等,这将给最终合理确定工程造价带来一定的困难。所以,竣工决算这最后一道关口的主要目的就是促进建设单位强化管理意识、完善管理制度、改进管理方法等.使工程建设投资达到最佳的经济性、效率性、效果性。审计人员必须秉公办事,坚持原则,从严把关。工作中应坚持深入施工现场,了解工程变更内容纳具体做法。熟悉工程变更、增减工程量情况,为决算审计打下基础。同时要建立严格的审计制度。只有坚持严格的办法和程序才能保证决算的真实性、严肃性。开展建设项目全过程控制,实施跟踪审计,掌握建设项目从设计到施工每一环节的第一手资料,为客观公正地确定工程造价提供可靠的审计依据。
4.施工阶段的工程造价管理的关键
施工单位工程造价管理的目标就是利用科学管理的方法,合理确定造价和有利控制,以提高施工企业的经营效果,因此在施工阶段的工程造价管理实施中要注意以下几点。
4.1合同管理
施工合同是工程建设的主要合同,它明确了企业在工程承包中的权利和义务,将工程招投标、工程款的拨付方式、索赔方式、材料的购置、竣工结算方式等以法律的形式确定下来,是企业组织施工、进行项目经验的法律依据。由于建设工程具有投资大、工期长、涉及原材料种类多、过程工序复杂、质量要求严格和受地理环境影响大的特点,在施工过程中经常要与设计单位、政府主管部门等取得联系,所有这些都决定了施工合同涉及的内容多而复杂。因此,要有效控制工程造价,提高企业的利润,首先要从施工合同管理入手,加强对施工合同的管理。
4.2优化施工方案并组织实施
施工前,要结合施工图纸及施工现场实际情况、自身的机械设备、施工经验、管理水平和技术规范验收标准,编制一套切实、经济、可行的施工方案。施工方案因指导施工准备乃至施工全过程的技术经济文件的不同而不同,一份好的施工方案能指导项目部合理利用人力、物力、财力,以最低投入满足合同要求。因此,施工方案是过程实施的行动纲领。由于中标价格较低或设计概算先天不足等原因,这就要求施工企业必须合理组织施工,节约成本,力求在管理中出效益。
4.3现场管理
4.3.1工程变更由于工程建设的周期长、涉及的经济关系和法律关系复杂、受自然条件和客观因素的影响大,导致项目的实际情况与项目招标投标时的情况相比会发生一些变化,所以应重点加强设计变更的管理。在施工过程中,如果发生设计变更,将对施工进度产生很大的影响。因此,应尽量减少设计变更,如果必须对设计进行变更,应尽量提前,变更发生得越早损失越小,反之就越大,尤其对影响过程造价的重大设计变更,更要用先算账后变更的方法解决,使工程造价得到有效控制。否则,现场施工技术人员只顾施工,对于施工中的工程项目或工程量增减未能与业主及时办理变更委托手续或手续模糊等,都给结算带来很多麻烦。
4.4材料费用的控制
加强材料、设备的采购供应,控制材料价格。材料费用是构成工程造价的主要因素。据测算,一般建筑工程中材料费用占60%~70%左右,且呈上升趋势。由此可见,选用材料是否经济合理,对降低造价起着十分关键的作用。在施工前,对工程所需材料不仅要进行货源的调查研究,广泛收集供货信息,尽量寻找货和价的最佳结合点,而且还要根据施工方案及有关技术实际需要的材料、设备总量,编制好需求计划。在施工中做好旬、月计划,要充分考虑资金的合理运转和现场场地实际情况以及工程进度需要,合理安排施工所需机械的进退场,特别要注意材料的保管,以免出现如水泥在保管中因违规堆放出现受潮及底层结块、钢筋未垫好而出现锈蚀导致不能试验等现象,避免不必要的浪费,制定合理的材料采购、保管制度,监理材料价格信息中心和材料价格监管机制,提高采购人员的自身素质和业务水平,保证货比三家,质优价廉地购买材料,减少工程成本,提高企业利润。4.5竣工结算
建设工程竣工结算是施工单位所承包的工程按照建设工程施工合同所规定的施工内容全部完工交付使用后,向发包单位办理竣工后工程价款结算的文件。竣工结算编制的主要依據为:1)施工承包合同补充协议,开、竣工报告书;2)设计施工图及竣工图;3)设计变更通知单;4)现场签证记录;5)甲乙双方供料手续或有关规定;6)采用有关的工程定额、专用定额与工期相应的市场材料价格及有关预结算文件等。施工单位在完成合同规定的全部内容,经验收符合合同要求后,根据以上原则组织专业人员编制完整的结算,并及时保送建设单位。 工程完工后,必须对该工程的所有财产和物资进行清理,作为企业内部成本核算的依据,并认真总结,进行成本分析,计算节约或超支的数额并分析原因,吸取经验教训,以利于下一个工程施工造价的管理与控制。
5总结
总之,工程造价是一项系统工程,需要进行全过程、全方位的管理。运用科学技术原理和经济及法律手段,解决工程建设活动中的技术与经济、经营与管理等实际问题,只有在项目建设的各个阶段,采用科学的计价方法和切合实际的计价依据,合理确定投资估算、初步设计概算、施工图预算和竣工结算,才能提高投资效益。
参考文献
[1] 刘秀凤,浅谈建筑工程造价的合理有效控制与探索[J]. 科技咨询导报 , 2007,(04) .
[2] 廖石坚,浅谈土建工程造价的科学控制[J]. 科技咨询导报 , 2007,(02) .
关键字:工程造价、工程造价管理、工程造价控制
Abstract: with the rapid development of socialist market economy, the construction industry field of investment will be multiplied. In this context, as the main body of investment project construction units, must be carefully discussion in the new period of the project management development direction, development trend and development measures. Construction industry in our country now is still in the management comparatively extensive and backward stage. But under the new situation, the construction industry in our country is through the quantitative change to seek a qualitative change happened the breakthrough. New construction market need more perfect competition rules and a more powerful competition subject. Therefore, the construction project engineering cost optimization problems became a top priority.
Key word: engineering cost, project cost management, project cost control
中图分类号:TU723.3文献标识码:A文章编号:
引言
随着改革的深化,投资主体向多元化发展。工程造价管理关系到投资主体和承包商的经济利益。关系到整个市场的竞争规范,建筑业劳动生产率的逐步提高以及全社会的科技水平的进步等一系列问题。而目前我国的建筑工程造价管理远远落后于建筑业的快速发展形势,工程造价管理体系中存在的许多深层次的问题严重制约着建筑业的发展。因此其改革理所当然成为建筑业改革的核心问题。中国建设工程造价管理如何改革、创新、适应社会主义市场经济发展需要、与国际惯例接轨等也就首当其冲地成为目前建筑界理论和实践的一个热点问题。
工程造价的控制是一项集管理、技术、质量、施工于一体的综合性的系统工程。因此要求各专业人员从各自的范围着手,有效控制资金投入,才能解决建设资金的需求与有限供给之间的矛盾。加强工程造价控制的重大意义就是在于合理使用人力、物力、财力等,从而取得最佳的经济效益和社会效益。
1.工程造价控制
長期以来,建设单位普遍忽视了工程建设项目前期工作阶段的造价控制,而是把重点放在施工阶段--审核施工图预算、工程结算价款。忽略了前期工作阶段作为投资控制基础的投资估算和设计概算的作用,因此,造成了概算超估算,预算超概算,结算超预算的"三超"现象。
做好方案优化是控制工程造价的关键。据国外统计资料表明,在项目前期方案优化过程中节约投资的可能性为80%左右。所以,要真正有效地控制工程造价,就应该把工作重点放在前期工作上,在完成市场研究以后,结合项目的实际情况,在满足使用要求的前提下,遵循"效益至上"的原则,进行多方案比选。这就要求设计人员必须牢固树立经济意识,克服重技术,轻经济,设计保守浪费的倾向,经济人员应有专业知识,了解设计意图,熟悉工艺技术方案,和设计人员密切配合,用动态分析方法进行多方案技术经济比较,要在降低工程造价上下功夫。通过方案优化,使工艺流程尽量简单,设备选型更加合理,从而节约大量资金。
2.其中施工阶段要做到以下几点:
2.1减少工程中的"签证工"。
2.2合理组织材料进场。
2.3控制好工程款的支付额度和进度。
3. 竣工决算阶段的工程造价控制
由于竣工结算审计是事后审计,很多问题很难发现.如设计、发包、合同签定的背景及施工中发生的细节等,这将给最终合理确定工程造价带来一定的困难。所以,竣工决算这最后一道关口的主要目的就是促进建设单位强化管理意识、完善管理制度、改进管理方法等.使工程建设投资达到最佳的经济性、效率性、效果性。审计人员必须秉公办事,坚持原则,从严把关。工作中应坚持深入施工现场,了解工程变更内容纳具体做法。熟悉工程变更、增减工程量情况,为决算审计打下基础。同时要建立严格的审计制度。只有坚持严格的办法和程序才能保证决算的真实性、严肃性。开展建设项目全过程控制,实施跟踪审计,掌握建设项目从设计到施工每一环节的第一手资料,为客观公正地确定工程造价提供可靠的审计依据。
4.施工阶段的工程造价管理的关键
施工单位工程造价管理的目标就是利用科学管理的方法,合理确定造价和有利控制,以提高施工企业的经营效果,因此在施工阶段的工程造价管理实施中要注意以下几点。
4.1合同管理
施工合同是工程建设的主要合同,它明确了企业在工程承包中的权利和义务,将工程招投标、工程款的拨付方式、索赔方式、材料的购置、竣工结算方式等以法律的形式确定下来,是企业组织施工、进行项目经验的法律依据。由于建设工程具有投资大、工期长、涉及原材料种类多、过程工序复杂、质量要求严格和受地理环境影响大的特点,在施工过程中经常要与设计单位、政府主管部门等取得联系,所有这些都决定了施工合同涉及的内容多而复杂。因此,要有效控制工程造价,提高企业的利润,首先要从施工合同管理入手,加强对施工合同的管理。
4.2优化施工方案并组织实施
施工前,要结合施工图纸及施工现场实际情况、自身的机械设备、施工经验、管理水平和技术规范验收标准,编制一套切实、经济、可行的施工方案。施工方案因指导施工准备乃至施工全过程的技术经济文件的不同而不同,一份好的施工方案能指导项目部合理利用人力、物力、财力,以最低投入满足合同要求。因此,施工方案是过程实施的行动纲领。由于中标价格较低或设计概算先天不足等原因,这就要求施工企业必须合理组织施工,节约成本,力求在管理中出效益。
4.3现场管理
4.3.1工程变更由于工程建设的周期长、涉及的经济关系和法律关系复杂、受自然条件和客观因素的影响大,导致项目的实际情况与项目招标投标时的情况相比会发生一些变化,所以应重点加强设计变更的管理。在施工过程中,如果发生设计变更,将对施工进度产生很大的影响。因此,应尽量减少设计变更,如果必须对设计进行变更,应尽量提前,变更发生得越早损失越小,反之就越大,尤其对影响过程造价的重大设计变更,更要用先算账后变更的方法解决,使工程造价得到有效控制。否则,现场施工技术人员只顾施工,对于施工中的工程项目或工程量增减未能与业主及时办理变更委托手续或手续模糊等,都给结算带来很多麻烦。
4.4材料费用的控制
加强材料、设备的采购供应,控制材料价格。材料费用是构成工程造价的主要因素。据测算,一般建筑工程中材料费用占60%~70%左右,且呈上升趋势。由此可见,选用材料是否经济合理,对降低造价起着十分关键的作用。在施工前,对工程所需材料不仅要进行货源的调查研究,广泛收集供货信息,尽量寻找货和价的最佳结合点,而且还要根据施工方案及有关技术实际需要的材料、设备总量,编制好需求计划。在施工中做好旬、月计划,要充分考虑资金的合理运转和现场场地实际情况以及工程进度需要,合理安排施工所需机械的进退场,特别要注意材料的保管,以免出现如水泥在保管中因违规堆放出现受潮及底层结块、钢筋未垫好而出现锈蚀导致不能试验等现象,避免不必要的浪费,制定合理的材料采购、保管制度,监理材料价格信息中心和材料价格监管机制,提高采购人员的自身素质和业务水平,保证货比三家,质优价廉地购买材料,减少工程成本,提高企业利润。4.5竣工结算
建设工程竣工结算是施工单位所承包的工程按照建设工程施工合同所规定的施工内容全部完工交付使用后,向发包单位办理竣工后工程价款结算的文件。竣工结算编制的主要依據为:1)施工承包合同补充协议,开、竣工报告书;2)设计施工图及竣工图;3)设计变更通知单;4)现场签证记录;5)甲乙双方供料手续或有关规定;6)采用有关的工程定额、专用定额与工期相应的市场材料价格及有关预结算文件等。施工单位在完成合同规定的全部内容,经验收符合合同要求后,根据以上原则组织专业人员编制完整的结算,并及时保送建设单位。 工程完工后,必须对该工程的所有财产和物资进行清理,作为企业内部成本核算的依据,并认真总结,进行成本分析,计算节约或超支的数额并分析原因,吸取经验教训,以利于下一个工程施工造价的管理与控制。
5总结
总之,工程造价是一项系统工程,需要进行全过程、全方位的管理。运用科学技术原理和经济及法律手段,解决工程建设活动中的技术与经济、经营与管理等实际问题,只有在项目建设的各个阶段,采用科学的计价方法和切合实际的计价依据,合理确定投资估算、初步设计概算、施工图预算和竣工结算,才能提高投资效益。