论文部分内容阅读
我国容量最大的(10.7万吨)的全现浇钢筋混凝土矩形清水池于1988年5月在北京市第九水厂净配水厂建成并投入使用。由于设计、施工等各方面的密切配合、积极努力,依靠科技进步、加强管理,采用趋于“标准化”、“通用化”体系的设计和施工技术,使工程获得较为满意的结果。水池结构的外观如内涵质量都有显著的提高,
China’s largest capacity (107,000 tons) of all cast-in-place reinforced concrete rectangular clear pond in May 1988 in Beijing Ninth Waterworks net waterworks built and put into use. Due to the close coordination of design, construction and other aspects, we worked hard and relied on the progress of science and technology, strengthened management, and adopted the design and construction technologies that are becoming “standardized” and “universalized” to make the project more satisfactory. The appearance of the pool structure, such as the quality of the content has significantly improved,