我国现行规定,一般大中型和限额以上的项目从建设前期工作到建设,投产要经历以下几个阶段:项目建议书、可行性研究、基础设计、详细设计、招投标及施工阶段、竣工结算与后评价阶段。而设计单位主要承担项目建议书、可行性研究报告编制、基础设计、详细设计工作过程,这一过程就成了工程建设和投资控制的关键,是全过程造价控制的重点,对工程造价的影响高达75%以上,对最后的效用影响起决定性作用。这就迫使设计单位运用系统的思想,从全面的角度,对每一个方面的最优方案进行整体性的优化组合。最终给决策者提供一个能尽量实现项目利益相关各方满意的实施方案。下面笔者结合近年来的工作经验,就设计单位参与的项目造价管理的各个阶段遇到的问题阐述一下自己的观点及看法。
China’s current regulations, the general large and medium-sized projects above the limit from the construction of pre-construction to construction, put into production to go through the following stages: project proposals, feasibility studies, basic design, detailed design, bidding and construction phase, settlement and completion Post evaluation stage. The design unit is mainly responsible for the project proposal, feasibility study report preparation, basic design, detailed design process, the process has become the key to project construction and investment control is the focus of the entire process of cost control, the impact on project cost As high as 75% or more, the final effect of play a decisive role. This forced the design unit to use the system of thinking, from a comprehensive point of view, for each aspect of the optimal program overall optimization and combination. And ultimately provide decision makers with a plan of implementation that will maximize the satisfaction of all stakeholders in the project. Now I combine the work experience in recent years, the design unit to participate in the project management of the various stages of the problems encountered to elaborate their own views and opinions.