论文部分内容阅读
本文对某采用外融冰冰蓄冷的区域供冷工程的水系统进行分析,在设置融冰板换及取消融冰板换的不同方案情况下,对系统可靠性、经济性及运行管理复杂性等方面进行分析,得出在该技术类型的工程情况下需要配置融冰板换满足系统稳定经济运行要求的建议,为后续工程的设计提供参考。
This paper analyzes the water system of a regional cooling project with ice-cold storage outside, under the different schemes of setting the ice-plate replacement and replacing the ice-plate replacement, the system reliability, economy and operation management complexity It is concluded that it is necessary to dispose the ice-melting plate in order to meet the requirements of the stable economic operation of the system in the case of the engineering project of the technology type, and provide reference for the design of subsequent projects.