论文部分内容阅读
1955年11月至1956年11月问,我参加了西北的沟壑土坝的查勘、设计和施工等一系列的工作,通过这些实际工作的锻炼和学习,的确学到了不少书本上找不到的东西,获得一次既实际又生动的教育,特别是对每一个工程的全面认识,得到了进一步理解。现在我将这些体会,简单整理出来和同志们一道研究,并请指正。一随着农业合作化的迅速发展,西北广大水土流失区的人民,对建设山区的信心,空前的提高,对水土保持各项措施工程的规划设计,一天比一天要求更迫切,因而,出现了技术设计赶不上施工需要的现象。为了解决这个矛盾,西北黄河工程局于1955年11月至
From November 1955 to November 1956, I asked a series of work such as the investigation, design and construction of dug earth dams in the northwest. Through the training and study of these practical work, I did indeed find many books that I could not find Things, get a real and vivid education, especially a comprehensive understanding of each project has been further understood. Now I will experience these, simply sorted out and comrades together to study, and please correct me. With the rapid development of agricultural cooperation, people in the vast areas of soil erosion in northwestern China have seen unprecedented confidence in the construction of mountain areas and an unprecedented increase in the planning and design of all measures for water and soil conservation. Technical design can not keep up with the construction needs of the phenomenon. In order to solve this contradiction, the Northwest Yellow River Engineering Bureau in November 1955 to