论文部分内容阅读
文章以新建沪昆铁路客运专线三标工程为例,通过对石灰改良土填料方案的施工条件进行分析,论证了方案的可行性,从而合理选择施工方案,保证了工程的工期和质量。
Taking the construction project of Shanghai-Kunming Railway Passenger Dedicated Line as an example, the article analyzes the construction conditions of the lime-modified soil packing scheme, and proves the feasibility of the scheme so as to reasonably choose the construction scheme and ensure the construction duration and quality.