温室在交付使用之前须进行质量验收,先进行各分项系统验收,再进行总体验收。验收完毕,形成验收报告。1.土建工程土建工程质量验收应根据设计施工图参照相关标准执行。温室基础顶面标高与尺寸的准确性影响结构工程的施工,基础施工允许偏差应满足下述要求:
Before delivery, the greenhouses shall carry out the quality inspection, carry out the inspection of all sub-systems first, and then conduct the overall inspection. Acceptance is completed, the formation of acceptance report. 1. Civil Engineering Civil Engineering Quality Acceptance should be based on the design and construction plans with reference to the relevant standards. The accuracy of the elevation and size of the top of greenhouse foundation affects the construction of structural engineering. The allowable deviation of foundation construction shall meet the following requirements: