因为可以与水电形成季节性互补,云南风电限电情况相对较少,因此该地区的风电开发备受关注。在风电开发暂停一段时间后,2014年云南省发展改革委下发《关于恢复全省风电建设有关事项的通知》,开始批复新的风电项目。然而,云南地处云贵高原,地貌褶皱纵横,大部分风电项目都位于高海拔地区,对设备质量、建设成本、施工难度等要求甚高。这使得一个高海拔风电场在设备生产与选型、工程建
Because it can form a seasonal complementarity with hydropower, Yunnan wind power shortage is relatively small, so the wind power development in the region has drawn much attention. After the wind power development was suspended for some time, in 2014, the Yunnan Provincial Development and Reform Commission issued the Circular on Restoring Wind Power Projects in the Province and started to approve new wind power projects. However, Yunnan is located in the Yunnan-Guizhou Plateau, with pleat folds vertically and most of its wind power projects are located in high-altitude areas with high requirements on equipment quality, construction cost and construction difficulty. This makes a high-altitude wind farm in the equipment production and selection, construction