本文对1800kVA矿热炉利用2000kVA精炼电炉变压器,经局部改进后转变为精炼电炉冶炼中碳锰铁的情况进行了总结。其结果表明只要措施得当,采取交叉布线于精炼电炉是可行的,同时达到调整产品结构的目的
In this paper, 2000kVA submerged arc furnace using 2000kVA refining furnace transformer, after partial improvement into a refining furnace smelting carbon ferromanganese case was summarized. The results show that as long as appropriate measures to take cross-wiring in the refining furnace is feasible, at the same time to achieve the purpose of adjusting the product structure