论文部分内容阅读
摘要:随着社会经济的高速发展,工民建工程的质量与办事质量的总体水平也在日益提升,但是施工整个过程中的质量控制的好坏会直接影响到工程项目的投资与工程投资本钱,有时甚至会威胁生命和财产的安全。最终将直接影响到咱们社会的经济发展速度与程度。本文首先介绍了工民建工程的施工过程中质量控制的基本程序, 然后提出在我国目前工民建施工过程中质量控制的现状, 最后就出现的问题提出施工过程质量控制的改进方法。
关键词:工民建;施工过程;质量控制
Abstract: with the rapid development of social economy, the overall level of quality and service quality of civil engineering is also rising, but the construction quality control of the whole process will influence the project investment and project investment cost, sometimes even threatened the security of life and property. The final will directly affect the economic development speed and level of our society. This paper first introduces the basic procedures of quality control during the construction of civil engineering in, then put forward in the present situation of China civil engineering construction process quality control, the problem put forward the improvement method of construction process quality control.
Keywords : Civil Engineering; construction process; quality control
中图分类号:TU71文献标识码:A 文章编号:2095-2104(2013)
前言
工民建工程项目的施工过程中, 涉及层面较广, 是一个比较复杂的实施过程。而可以影响工程施工质量的因素又是多种多样的, 从工程设计、 施工材料、 机械工具、 地形地貌、 水文环境、 气象环境到施工的具体工艺、 操作工序、 技术管控、 制度管理等, 都可以影响工程项目的施工质量。工程项目具有一次成型的特点, 在建设完成后, 不能随意更改修整, 因此, 工民建工程施工项目中的质量控制,是项目质量保证的必要条件。
一、工民建施工整个过程质量控制的整体要求
工民建的质量控制是贯穿整个施工整个过程的,并且必需根据质量办理体制联合多个单位与单位共同办理与实施。工民建施工质量控制的总体要求便是要符合社会主义发展观中建筑工程质量的标准与法规。每一个工程项目都要经过各自不一样的方式来确定工程的质量。施工单位的质量控制是经过设立各个单位的质量控制标准,最终在建筑物竣工时达到预期的效果。设计单位的质量控制目标是经过前期的预计提出合理的设计建议,设计难题难题时要了解全面、设计全面,要考虑到设计变动控制、最后的质量验收并且可以及时改正施工中出现的难题;施工单位的质量控制目标是施工整个过程中现场控制,包管在工程竣工时达到建筑的质量要求;监理单位的质量控制目标是根据建筑业的质量标准去审核建筑质量,协调施工单位和承包单位的关系,关注质量活动,其目的也是为了使建筑达到设计的目标与要求。
二、工民建施工过程中质量控制的基本程序
在施工过程中, 主要的质量控制是由监理单位完成的。 监理单位对单项工程的质量控制主要按下述程序进行。
(一)审核承包商的“单项工程开工申请单”
在每个单项工程施工开始前, 施工承包商均需填写 “单项工程开工申请单”, 并附上施工组织计划及施工技术措施设计、 机具设备与技术工人数量、 材料及施工机具设备到场情况, 各项施工用的建筑材料试验报告, 以及分包商的资格证明等, 报送监理单位进行审核。
(二)现场检查和监理试验室试验或联合检查
在单项工程过程中, 监理单位除了应检查、 帮助、 督促承包商的全面质量管理保证体系正常运作之外,还应要求承包商严格执行工程质量的多项检查。监理单位应在商定的时间到现场对每一道工序用目视检测包括目测、 手测、 机械检测等方法逐项进行检查, 必要时利用承包商的试验室进行现场抽检。
(三)组织现场检查
监理单位在收到承包商的 《中间交工证书》 并汇总检查该单项工程中每道工序的 《工程质量合格证》 后, 应组织项目法人、 质量监督站和各有关专业监理单位以及承包商,再次对该单项工程进行全面的检查, 以确定是否具备中间交工的条件。 必要时, 可进行试验室检查。
三、工民建施工过程中质量控制的现状
在现代化的建设中, 工民建工程日渐重要, 工民建工程质量的好坏将直接关系到建筑物的安全和使用功能。 那么, 目前我国的施工质量究竟如何,为此,我们对这个问题进行了调研。目前工民建工程质量现状的评价是: 总体受控、 确保动能、 稳中有升、水平不齐、 精品不多那么是什么原因形成目前的局面呢?
1.领导思想上重视不够, 工民建工程质量好坏往往与施工企业领导对工民建工程重视程度有很大的关系。但是很多企业的主要领导认为, 搞工程抓好经济效益是主要的事情, 因此在招投标和承接工程任务等经营活动上花费了很大的精力,对如何提高施工质量尤其是工民建工程的質量往往重视不够。
2.施工专业人员对规范、 标准掌握不够, 劳务分包队伍缺乏培训水平低下,一些企业的施工施工人员、 质量管理人员对强制性技术规范、 标准不够熟悉, 没有很好地掌握和应用。
3.在立体交叉施工过程中的协调也很为重要, 如果大家各干各的互不通气, 往往造成不必要的返工, 从而影响施工质量。 由此可见,总包单位只有真正履行总承包责任制,对工民建工程进行有效的管理, 才能确保工民建工程的质量。
四、工民建施工过程质量控制的改进方法
施工是具体工程项目物理实现的过程,也是最终的产品建筑质量的核心决定因素。因此, 必须提高工民建工程项目的质量, 严格把控好施工过程中的质量控制。
(一)培训、 优选施工人员
工程质量的形成是质量控制的基础过程,而工程质量的形成是所有人共同努力的结果。 建设施工过程的最基本要素还是 “人”。 所有参与项目施工的人, 包括管理技术干部、 操作人员、 服务人员,而施工人员是工程质量保证的核心载体。因此, 想要提高施工质量, 就必须培训并选择水平较高的施工人员,提高施工人员整体的素质。
(二)严格保证建材、 建筑构配件和设备的质量, 打好工程建设的物质基础
挑选具有专业知识, 对项目经理忠实、 守信的工作人员从事采购质量工作, 把握材料质量、具体价格、 厂商供货能力等各方面的信息。要选择具有国家认证许可资质、 在技术和资金上有保证的供货厂商。 选购具有完全产品合格证明, 且社会信誉良好的产品。 这样既可以把好好建筑施工材料的质量关,也可以降低工程施工在材料方面的成本。
(三)依靠科技进步, 强化全面质量管理
要提高施工质量控制, 实现高水平的施工质量控制, 与技术进步紧密相连。技术方面的提升, 除提升工作人员的专业素质外, 还包括装备升级、 信息优化、 检验方法和检测技术的进步等。要保证工程质量, 就必须保证新技术和新工艺的先进水平。在施工过程中, 必须建立符合高水准技术要求的整体工艺流程、 工程质量标准、具体操作规程, 并建立完善的考核制度, 在不断提高施工技术和改进施工工艺水平的基础上, 保证工程的高质量。而且工民建工程项目必须建立高效率、有效果的质量保证系统, 建立明确的质量责任制, 确保问题的责任明确。
(四)建立工民建施工质量控制体系
严格按照国家规定,施工质量控制要创建与落实质量责任制。控制体系要严格实行工程质量终身负责制。为了杜绝重大工程质量事故,随时抽查检查工程质量,对已交付的工程也要定期调查,发现难题及时纠正直到达到质量标准为止。增强员工创新意识,强化质量检查方法,执行监督与奖惩制。要全面推广应用建设部的优化创新技术。把创新新技术推广作为工作重点来抓,提升工民建施工整个过程的质量提供技术支持。
五、结束语
总之,要确保工民建工程的質量,就要备有完善的质量体系与严格的质量检查体制。确定工民建施工程序质量控制筹划,工序要分清主次,抓住重点。清晰且明确地设置工民建施工程序质量控制点,杜绝隐患。使建筑工程实现最大优化。
参考文献:
[1]周成帅, 孙亚军.略论施工过程中的项目管理与质量控制[J].中国高新技术企业.2010 (1) .
[2]顾慰慈.工程监理质量控制[M].中国建材工业出版社.2001.
[3]颜文照.浅谈施工过程的质量控制[J].新疆科技报(汉).2004(11) .
[4]毛鹤琴.建设项目质量控制[M].地震出版社.1993.
[5]张桂华.葛建淳.浅谈施工过程的质量控制和监督[J].甘肃科技.2010 (2) .
关键词:工民建;施工过程;质量控制
Abstract: with the rapid development of social economy, the overall level of quality and service quality of civil engineering is also rising, but the construction quality control of the whole process will influence the project investment and project investment cost, sometimes even threatened the security of life and property. The final will directly affect the economic development speed and level of our society. This paper first introduces the basic procedures of quality control during the construction of civil engineering in, then put forward in the present situation of China civil engineering construction process quality control, the problem put forward the improvement method of construction process quality control.
Keywords : Civil Engineering; construction process; quality control
中图分类号:TU71文献标识码:A 文章编号:2095-2104(2013)
前言
工民建工程项目的施工过程中, 涉及层面较广, 是一个比较复杂的实施过程。而可以影响工程施工质量的因素又是多种多样的, 从工程设计、 施工材料、 机械工具、 地形地貌、 水文环境、 气象环境到施工的具体工艺、 操作工序、 技术管控、 制度管理等, 都可以影响工程项目的施工质量。工程项目具有一次成型的特点, 在建设完成后, 不能随意更改修整, 因此, 工民建工程施工项目中的质量控制,是项目质量保证的必要条件。
一、工民建施工整个过程质量控制的整体要求
工民建的质量控制是贯穿整个施工整个过程的,并且必需根据质量办理体制联合多个单位与单位共同办理与实施。工民建施工质量控制的总体要求便是要符合社会主义发展观中建筑工程质量的标准与法规。每一个工程项目都要经过各自不一样的方式来确定工程的质量。施工单位的质量控制是经过设立各个单位的质量控制标准,最终在建筑物竣工时达到预期的效果。设计单位的质量控制目标是经过前期的预计提出合理的设计建议,设计难题难题时要了解全面、设计全面,要考虑到设计变动控制、最后的质量验收并且可以及时改正施工中出现的难题;施工单位的质量控制目标是施工整个过程中现场控制,包管在工程竣工时达到建筑的质量要求;监理单位的质量控制目标是根据建筑业的质量标准去审核建筑质量,协调施工单位和承包单位的关系,关注质量活动,其目的也是为了使建筑达到设计的目标与要求。
二、工民建施工过程中质量控制的基本程序
在施工过程中, 主要的质量控制是由监理单位完成的。 监理单位对单项工程的质量控制主要按下述程序进行。
(一)审核承包商的“单项工程开工申请单”
在每个单项工程施工开始前, 施工承包商均需填写 “单项工程开工申请单”, 并附上施工组织计划及施工技术措施设计、 机具设备与技术工人数量、 材料及施工机具设备到场情况, 各项施工用的建筑材料试验报告, 以及分包商的资格证明等, 报送监理单位进行审核。
(二)现场检查和监理试验室试验或联合检查
在单项工程过程中, 监理单位除了应检查、 帮助、 督促承包商的全面质量管理保证体系正常运作之外,还应要求承包商严格执行工程质量的多项检查。监理单位应在商定的时间到现场对每一道工序用目视检测包括目测、 手测、 机械检测等方法逐项进行检查, 必要时利用承包商的试验室进行现场抽检。
(三)组织现场检查
监理单位在收到承包商的 《中间交工证书》 并汇总检查该单项工程中每道工序的 《工程质量合格证》 后, 应组织项目法人、 质量监督站和各有关专业监理单位以及承包商,再次对该单项工程进行全面的检查, 以确定是否具备中间交工的条件。 必要时, 可进行试验室检查。
三、工民建施工过程中质量控制的现状
在现代化的建设中, 工民建工程日渐重要, 工民建工程质量的好坏将直接关系到建筑物的安全和使用功能。 那么, 目前我国的施工质量究竟如何,为此,我们对这个问题进行了调研。目前工民建工程质量现状的评价是: 总体受控、 确保动能、 稳中有升、水平不齐、 精品不多那么是什么原因形成目前的局面呢?
1.领导思想上重视不够, 工民建工程质量好坏往往与施工企业领导对工民建工程重视程度有很大的关系。但是很多企业的主要领导认为, 搞工程抓好经济效益是主要的事情, 因此在招投标和承接工程任务等经营活动上花费了很大的精力,对如何提高施工质量尤其是工民建工程的質量往往重视不够。
2.施工专业人员对规范、 标准掌握不够, 劳务分包队伍缺乏培训水平低下,一些企业的施工施工人员、 质量管理人员对强制性技术规范、 标准不够熟悉, 没有很好地掌握和应用。
3.在立体交叉施工过程中的协调也很为重要, 如果大家各干各的互不通气, 往往造成不必要的返工, 从而影响施工质量。 由此可见,总包单位只有真正履行总承包责任制,对工民建工程进行有效的管理, 才能确保工民建工程的质量。
四、工民建施工过程质量控制的改进方法
施工是具体工程项目物理实现的过程,也是最终的产品建筑质量的核心决定因素。因此, 必须提高工民建工程项目的质量, 严格把控好施工过程中的质量控制。
(一)培训、 优选施工人员
工程质量的形成是质量控制的基础过程,而工程质量的形成是所有人共同努力的结果。 建设施工过程的最基本要素还是 “人”。 所有参与项目施工的人, 包括管理技术干部、 操作人员、 服务人员,而施工人员是工程质量保证的核心载体。因此, 想要提高施工质量, 就必须培训并选择水平较高的施工人员,提高施工人员整体的素质。
(二)严格保证建材、 建筑构配件和设备的质量, 打好工程建设的物质基础
挑选具有专业知识, 对项目经理忠实、 守信的工作人员从事采购质量工作, 把握材料质量、具体价格、 厂商供货能力等各方面的信息。要选择具有国家认证许可资质、 在技术和资金上有保证的供货厂商。 选购具有完全产品合格证明, 且社会信誉良好的产品。 这样既可以把好好建筑施工材料的质量关,也可以降低工程施工在材料方面的成本。
(三)依靠科技进步, 强化全面质量管理
要提高施工质量控制, 实现高水平的施工质量控制, 与技术进步紧密相连。技术方面的提升, 除提升工作人员的专业素质外, 还包括装备升级、 信息优化、 检验方法和检测技术的进步等。要保证工程质量, 就必须保证新技术和新工艺的先进水平。在施工过程中, 必须建立符合高水准技术要求的整体工艺流程、 工程质量标准、具体操作规程, 并建立完善的考核制度, 在不断提高施工技术和改进施工工艺水平的基础上, 保证工程的高质量。而且工民建工程项目必须建立高效率、有效果的质量保证系统, 建立明确的质量责任制, 确保问题的责任明确。
(四)建立工民建施工质量控制体系
严格按照国家规定,施工质量控制要创建与落实质量责任制。控制体系要严格实行工程质量终身负责制。为了杜绝重大工程质量事故,随时抽查检查工程质量,对已交付的工程也要定期调查,发现难题及时纠正直到达到质量标准为止。增强员工创新意识,强化质量检查方法,执行监督与奖惩制。要全面推广应用建设部的优化创新技术。把创新新技术推广作为工作重点来抓,提升工民建施工整个过程的质量提供技术支持。
五、结束语
总之,要确保工民建工程的質量,就要备有完善的质量体系与严格的质量检查体制。确定工民建施工程序质量控制筹划,工序要分清主次,抓住重点。清晰且明确地设置工民建施工程序质量控制点,杜绝隐患。使建筑工程实现最大优化。
参考文献:
[1]周成帅, 孙亚军.略论施工过程中的项目管理与质量控制[J].中国高新技术企业.2010 (1) .
[2]顾慰慈.工程监理质量控制[M].中国建材工业出版社.2001.
[3]颜文照.浅谈施工过程的质量控制[J].新疆科技报(汉).2004(11) .
[4]毛鹤琴.建设项目质量控制[M].地震出版社.1993.
[5]张桂华.葛建淳.浅谈施工过程的质量控制和监督[J].甘肃科技.2010 (2) .