在建造拉特柴诺里水力发电站这一水力工程的设计中,引水工程问题已经得到了解决:即将次海尼斯—次哈里河的一部分水流,引到拉特柴诺里河中,然后把这两条河的合流引到里熬尼河。这一引水工程是通过一条长5.5公里多的无压力地道来完成的。先在次海尼斯—次哈里河上筑起一个不高的堤壩,并开掘一条长1.2公里的水渠,而水渠的尽头则紧接地道。次海尼斯—次哈里河的部分水流,就经过地道流到拉特柴诺里河去。然后用钢
In the design of the hydropower project at Ratchathani hydroelectric power station, the problem of diversion works has been solved: a part of the current flow of the Hynes-Sub-Hari River is diverted to the Ratchathani River, and then this The confluence of the two rivers leads to Niu Nai River. This water diversion project is accomplished through a pressureless tunnel of 5.5 km length. Build a low embankment on the Hainiss-Hurri River and dig a 1.2-kilometer channel, with the tunnel at the end of the tunnel. A portion of the current water flow from the Hainiss-Sub-Hari River flows through the Latruninoli River. Then use steel