摘要: 建设工程施工合同管理已成为工程项目管理的一项重要手段,它覆盖了合同策划、签订、实施、解决争议、风险管理、索赔及信息管理等多个方面。结合工程建设中施工合同管理的特点,从招投标阶段和合同施工过程两个方面对合同管理进行了分析,提出了合同管理的方法和措施,以提高合同管理质量。
关键词:合同管理;招投标阶段;合同实施
Abstract: The construction contract management has become an important means of project management, which covers many aspects of planning, implementation, signed contract, dispute settlement, risk management, claims and information management. According to the characteristics of construction contract management of engineering construction, from two aspects of bidding and contract construction process of contract management are analyzed, and puts forward some methods and measures to improve the contract management, contract management quality.
Key word: contract management; bidding; contract implementation
中圖分类号:TU71
1.工程招标投标阶段的合同管理
1.1合同的总体策划。合同总体策划的确定对整个工程项目有重大影响,其根本性和方向性的合同问题,是确定合同的战略问题,它们对整个项目的计划、组织、控制有决定性的影响。合同总体策划的可行性和有效性只有在工程的实施中体现出来。在项目实施过程中,开始准备每—份合同招标,以及准备签订每—份合同时,在工程结束阶段时都应对合同总体策划再作一次评价。
1.2招标文件的分析。承包商取得招标文件后应进行全面分析和正确理解。主要包括:1)招标文件的总体检查;2)招标条件分析;3)招标工作时间安排的分折;4)工程技术文件分析。
1.3合同文本分折。合同文本通常指合同协议书和合同条款等文件,是合同的核心,对合同文本的分折是一项综合性的、复杂的、技术性很强的工作。它要求合同管理者不但要熟悉与合同相关的法律、法规,精通合同条款,对工程环境有全面的了解,而且应有合同管理的实际工作经验和经历。一般来说,合同文本分析主要有四个方面内容:1)施工承包合同的合法性分析;2)施工承包合同的完整性分析;3)合同双方责任和权益分析;4)后果性分析。
1.4承包工程中的风险分析。风险是指在从事某项特定活动中因不确定性而产生的经济损失、自然破坏或损伤的可能性。在项目实施过程中。这些因素都有可能会产生变化,在各个方面都存在着不确定性。这些变化会使得原定的计划、方案受到干扰,使原定的目标不能实现。因此,必须在合同签订前对可能出现的各种风险作全面分析、预测,以采取有效的对策预防和降低风险的发生和损失。
1.5投标文件分析。投标文件的分析是招标人在建设工程项目招标过程中一项十分重要的合同管理工作。投标文件是投标人参与评标的凭证,也是未来的建设工程施工合同的重要组成部分。招标人应审查投标文件的合法性、有效性,分析比较投标报价、评审方案和其他评标因素,只有全面地分析和审查投标文件,才能正确地评标、定标。
1.6合同谈判。由于建设工程项目招标文件和投标文件的局限性,不可能充分涵盖未来建设工程项目实施过程中可能遇到的各种情况,同时,合同双方对招标文件和投标文件的理解也不尽相同。因此必须在建设工程施工合同正式订立前对合同进行谈判和协商,进一步澄清和补充合同条款,使合同双方在谈判中进—步地沟通,详细地交换意见。通过合同谈判,完善合同条款,合理分配合同风险和合同权利、义务与责任。
2.合同实施控制 建设工程施工的过程就是施工合同的实施过程,要使合同顺利实施,合同双方必须共同完成各自的合同责任。施工合同的实施管理与控制应贯彻到工程实施的各项工作之中,主要工作包括:
2.1参与落实计划。合同管理人员与项目的其他职能人员一起落实合同实施计划,为各工程小组、分包商的工作提供必要的保证,如施工现场的安排,人工、材料、机械等计划的落实,工序间的搭接关系和安排以及其他一些必要的准备工作。
2.2协调各方关系。在合同范围内协调业主、工程师、项目管理各职能人员所属的各工程小组和分包商之间的工作关系;解决相互之间出现的问题,如合同责任界面之间的争议、工程活动之间时间上和空间上的不协调。承包商与业主、与业主的其他承包商、与材料和设备供应商、与分包商,以及承包商的各分包商之间、工剧、组与分包商之间常常互相推甸一些合同中或合同事件表中末明确划定的工程活动的责任,这就会引起内部和外部的争议。
2.3指导合同工作。合同管理人员对各工程小组和分包商进行工作指导,作经常性的合同解释,使各工程小组都有全局观念,对工程中发现的问题提出意见和建议。合同管理人员的目标不仅仅是索赔和反索赔,而且还要将各方面在合同关系上联系起来,防止漏洞和弥补损失,更完善地完成工程。
2.4参与其他项目控制工作。按合同要求,合同业主及工程师等对工程所用材科和设备开箱检查或作验收,看是否符合质量、图纸和技术规范等的要求,进行隐蔽工程和已完工程的检查验收,负责验收文件的起草和验收的组织工作,参与工程结算,会同造价工程师对向业主提出的工程款账单和分包商提交的收款单进行审查和确认。
2.5合同实施情况的追踪、偏差分析及参与处理。主要包括收集合同实施的信息及各种工程资料,并作出相应的信息处理;将合同实施情况与计划进行对比分析,找出偏差;对合同屉行情况作出诊断;向项目经理及时通报合同实施情况及问题;提出合同实施方面的意见、建议等。
2.6负责工程变更管理。工程变更管理是指参与变更谈判,对合同变更进行事务性处理,落实变更措施,修改变更相关的资科,检查变更措施落实情况,并及时反馈给项目经理和业主(监理工程师)。
2.7负责工程索赔管理。工程索赔管理包括与业主之间的索赔和反索赔,与分包商、材料供应商及其他方面之间的索赔和反索赔。
2.8负责工程文档管理。工程文档管理是指对分包商发出的任何指令,向业主发出的任何文字答复、请示,业主方发出的任何指令,都必须经合同管理人员审查,记录在案。
2.9防范工程合同违约行为 (1)谨慎订立合同、减少瑕疵合同以减少违约的发生。 (2)业主、承包商在合作中存在目标分歧的情形下,应借助各种制度安排来协调合作中的目标分歧以实现合作的潜在利益:包括工程监理制度,质量保修制,质量事故处罚制度等。 (3)要让监理发挥良好作用,抑制承包商的风险。 (4)加快信用制度建立,提高故意违约成本。
3、结语 使合同管理贯穿于从投标到工程竣工的全过程,既有利于合同目标的实现,又使技术和经济相结合,产生良好的经济效益。
关键词:合同管理;招投标阶段;合同实施
Abstract: The construction contract management has become an important means of project management, which covers many aspects of planning, implementation, signed contract, dispute settlement, risk management, claims and information management. According to the characteristics of construction contract management of engineering construction, from two aspects of bidding and contract construction process of contract management are analyzed, and puts forward some methods and measures to improve the contract management, contract management quality.
Key word: contract management; bidding; contract implementation
中圖分类号:TU71
1.工程招标投标阶段的合同管理
1.1合同的总体策划。合同总体策划的确定对整个工程项目有重大影响,其根本性和方向性的合同问题,是确定合同的战略问题,它们对整个项目的计划、组织、控制有决定性的影响。合同总体策划的可行性和有效性只有在工程的实施中体现出来。在项目实施过程中,开始准备每—份合同招标,以及准备签订每—份合同时,在工程结束阶段时都应对合同总体策划再作一次评价。
1.2招标文件的分析。承包商取得招标文件后应进行全面分析和正确理解。主要包括:1)招标文件的总体检查;2)招标条件分析;3)招标工作时间安排的分折;4)工程技术文件分析。
1.3合同文本分折。合同文本通常指合同协议书和合同条款等文件,是合同的核心,对合同文本的分折是一项综合性的、复杂的、技术性很强的工作。它要求合同管理者不但要熟悉与合同相关的法律、法规,精通合同条款,对工程环境有全面的了解,而且应有合同管理的实际工作经验和经历。一般来说,合同文本分析主要有四个方面内容:1)施工承包合同的合法性分析;2)施工承包合同的完整性分析;3)合同双方责任和权益分析;4)后果性分析。
1.4承包工程中的风险分析。风险是指在从事某项特定活动中因不确定性而产生的经济损失、自然破坏或损伤的可能性。在项目实施过程中。这些因素都有可能会产生变化,在各个方面都存在着不确定性。这些变化会使得原定的计划、方案受到干扰,使原定的目标不能实现。因此,必须在合同签订前对可能出现的各种风险作全面分析、预测,以采取有效的对策预防和降低风险的发生和损失。
1.5投标文件分析。投标文件的分析是招标人在建设工程项目招标过程中一项十分重要的合同管理工作。投标文件是投标人参与评标的凭证,也是未来的建设工程施工合同的重要组成部分。招标人应审查投标文件的合法性、有效性,分析比较投标报价、评审方案和其他评标因素,只有全面地分析和审查投标文件,才能正确地评标、定标。
1.6合同谈判。由于建设工程项目招标文件和投标文件的局限性,不可能充分涵盖未来建设工程项目实施过程中可能遇到的各种情况,同时,合同双方对招标文件和投标文件的理解也不尽相同。因此必须在建设工程施工合同正式订立前对合同进行谈判和协商,进一步澄清和补充合同条款,使合同双方在谈判中进—步地沟通,详细地交换意见。通过合同谈判,完善合同条款,合理分配合同风险和合同权利、义务与责任。
2.合同实施控制 建设工程施工的过程就是施工合同的实施过程,要使合同顺利实施,合同双方必须共同完成各自的合同责任。施工合同的实施管理与控制应贯彻到工程实施的各项工作之中,主要工作包括:
2.1参与落实计划。合同管理人员与项目的其他职能人员一起落实合同实施计划,为各工程小组、分包商的工作提供必要的保证,如施工现场的安排,人工、材料、机械等计划的落实,工序间的搭接关系和安排以及其他一些必要的准备工作。
2.2协调各方关系。在合同范围内协调业主、工程师、项目管理各职能人员所属的各工程小组和分包商之间的工作关系;解决相互之间出现的问题,如合同责任界面之间的争议、工程活动之间时间上和空间上的不协调。承包商与业主、与业主的其他承包商、与材料和设备供应商、与分包商,以及承包商的各分包商之间、工剧、组与分包商之间常常互相推甸一些合同中或合同事件表中末明确划定的工程活动的责任,这就会引起内部和外部的争议。
2.3指导合同工作。合同管理人员对各工程小组和分包商进行工作指导,作经常性的合同解释,使各工程小组都有全局观念,对工程中发现的问题提出意见和建议。合同管理人员的目标不仅仅是索赔和反索赔,而且还要将各方面在合同关系上联系起来,防止漏洞和弥补损失,更完善地完成工程。
2.4参与其他项目控制工作。按合同要求,合同业主及工程师等对工程所用材科和设备开箱检查或作验收,看是否符合质量、图纸和技术规范等的要求,进行隐蔽工程和已完工程的检查验收,负责验收文件的起草和验收的组织工作,参与工程结算,会同造价工程师对向业主提出的工程款账单和分包商提交的收款单进行审查和确认。
2.5合同实施情况的追踪、偏差分析及参与处理。主要包括收集合同实施的信息及各种工程资料,并作出相应的信息处理;将合同实施情况与计划进行对比分析,找出偏差;对合同屉行情况作出诊断;向项目经理及时通报合同实施情况及问题;提出合同实施方面的意见、建议等。
2.6负责工程变更管理。工程变更管理是指参与变更谈判,对合同变更进行事务性处理,落实变更措施,修改变更相关的资科,检查变更措施落实情况,并及时反馈给项目经理和业主(监理工程师)。
2.7负责工程索赔管理。工程索赔管理包括与业主之间的索赔和反索赔,与分包商、材料供应商及其他方面之间的索赔和反索赔。
2.8负责工程文档管理。工程文档管理是指对分包商发出的任何指令,向业主发出的任何文字答复、请示,业主方发出的任何指令,都必须经合同管理人员审查,记录在案。
2.9防范工程合同违约行为 (1)谨慎订立合同、减少瑕疵合同以减少违约的发生。 (2)业主、承包商在合作中存在目标分歧的情形下,应借助各种制度安排来协调合作中的目标分歧以实现合作的潜在利益:包括工程监理制度,质量保修制,质量事故处罚制度等。 (3)要让监理发挥良好作用,抑制承包商的风险。 (4)加快信用制度建立,提高故意违约成本。
3、结语 使合同管理贯穿于从投标到工程竣工的全过程,既有利于合同目标的实现,又使技术和经济相结合,产生良好的经济效益。