混凝土轨枕板新型轨道

来源 :铁道科技动态 | 被引量 : 0次 | 上传用户:y286491357
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
前言我国自1958年开始研究混凝土轨枕板新型轨道,经历了研究、选型、试铺和扩大试铺等各个阶段,至1980年底已在铁路线路上铺设轨枕板轨道169公里。其中铺在繁忙干线上有12公里,铺在隧道内的有33公里,铺在车站站场等线路的有7公里。铺设时间最长的在繁忙干线上达十五年半,铺在隧道内的也有十五年。二十多年的研究工作和十五年以上的铺设、运行经验已表明轨枕板轨道是适合我国铁路运输发展的一种较好的“少维修”轨道结构型式 Foreword Since 1958, China began to study the new type of orbit of concrete sleeper. It has undergone various stages of research, selection, testing and expansion of test shops. By the end of 1980, 169 km of rail sleepers have been laid on railway lines. Among them, there are 12 kilometers on the busy trunk road, 33 kilometers in the tunnel and 7 kilometers in the line of the station and station. The longest laying time was 15.5 years on the busy trunk road and 15 years in the tunnel. More than 20 years of research work and more than 15 years of laying and operating experience have shown that the sleeper rail is a good “less maintenance” orbit structure suitable for the development of China’s rail transport
其他文献
电机的绝缘,直接影响到电机的性能和它的长期可靠运行,因此在设计电机时,绝缘结构选用的合理与否是评价电机的一项重要指标。目前国外各先进国家,同步主发电机的绝缘结构均
一个在巴黎旅游的外国人,在车站附近遇到一个街头卖艺者,其琴声悠扬,令人感伤,吸引了不少行人。拉完一曲,周围的人纷纷向钱罐里丢钱,有的面额还不小。转眼工夫,钱已装满了罐
4月5日到5月25日由团长白圣铉(朝鲜水产省淡水渔业研究所所长)率领的朝鲜淡水渔业考察团,在我国湖北、湖南、广东、浙江、上海、河北等地进行了考察。随同前来的还有平安北
一、P_(50)型棚车厂修的基本情况 1.P_(50)型棚车系1952年设计,1953年开始由大连机车车辆工厂单位生产并投入运用的全钢50t棚车。据1981年统计,全路运 First, the P_ (50)
韶山型电力机车双边传动牵引电动机均要求电机电枢能横向窜动(即电枢相对机座在轴向能够少量移动)以适应轮对横向窜动的需要。为满足长期运行后某些部件磨耗引起的误差,要求
高比功率发动机的可靠性,依赖于发动机承受高负荷零件的耐久性。提高平均有效压力使得功率提高了,但是,发动机运动件或固定件承受的温度和压力将更高。基本的耐久性受到几个
青藏铁路通过多年冻土地区。该区的土层在冻结和融化过程中,由于伴随着发生物理化学变化而形成的一系列冻土现象,与工程建筑物的稳定有十分密切的关系。在冻结与融化的各个
为了提高晋煤外运的能力,丰沙大线(丰台西——沙城——大同)要实行电力机车牵引。丰沙线(丰台西——沙城)原蒸汽、内燃机车运行的几十个隧道和桥梁要组织电气化工程施工,自1
为了迅速地增加水产产量,供应市场更多的水产品,农产部于七月六日至十一日在天津市召开了水产工作座谈会。会议就迅速动员渔民、渔船归队,做好渔需物资供应,大抓立即见效的
在运输繁忙情况下,轨道的几何形状会发生垂直,纵向和水平变化,而现代的一些线路维修机械,例如具有整平—捣固—拨道功能的机械,能够恢复轨道原有的几何形状。随着维修机械作