论文部分内容阅读
介绍了广州卷烟二厂2号厂房楼面振动测试的情况.由于工厂设备更新,搂面受荷增大,振动增强,楼面使用的舒适性和安全性受到影响.为了建筑结构的安全,需要进行减振加固处理.因此对楼面进行了振动测试,确定减振加固的原则与方法.
The vibration test of the No. 2 plant of Guangzhou Cigarette Factory No. 2 is introduced. Due to the renewal of factory equipment, the increase of hump surface load and the increase of vibration, the comfort and safety of the use of the floor are affected. For the safety of the building structure, the need for vibration reinforcement. Therefore, the floor vibration test to determine the principles and methods of vibration reinforcement.