广东省惠州抽水蓄能电站项目(以下简称惠蓄项目)是广东省第二个抽水蓄能电站,总装机2400MW(8台300MW),属国家重点工程。业主为南方电网调峰调频发电公司,广东省水利电力勘测设计研究院承担该工程的勘测设计任务。2013年9月,由国家档案局组织的验收组对广东惠州抽水蓄能电站项目档案进行验收,验收组组长国家档案局经科司王燕民副司长指出,惠蓄项目档案管理与国内水电建设同
The Huizhou Pumped Storage Power Station project in Guangdong Province (hereinafter referred to as Huixu Project) is the second pumped storage power station in Guangdong Province with a total installed capacity of 2400MW (8 units of 300MW), which is a national key project. The owner is China Southern Power Grid peak frequency FM power generation company, Guangdong Provincial Water Conservancy Survey and Design Institute to undertake the survey and design tasks of the project. In September 2013, the inspection team organized by the State Archives Bureau accepted the files of the project of Huizhou pumped storage power station in Guangdong. The deputy director of the National Archives Bureau of the inspection team, Wang Yanmin, deputy director of the department pointed out that the archives management of Huicui Project and domestic hydropower construction with