溢流坝的消能工——挑水台

来源 :水力发电 | 被引量 : 0次 | 上传用户:Chanco
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、消能理论一股薄层的高速水流在空气中穿过时,因为空气的阻力,空气和水流的交界面上两种性質不同的質点的交混,以及水流内部質点彼此的置换和撞击等等作用,发生了极度的紊乱。水中吸入了大量空气,体积增大,比重减轻,流速降低。如果许多股薄层水流,同时在空气中穿过,并且能在空中一再互相撞击,那末,水流的含气就要更显著,原有动能就要消耗更多,水流就要扩散到更大的 Theory of Energy Dissipation When a thin layer of high-speed water flows through the air, two kinds of particles of different nature are mixed at the interface of air and water flow because of the air resistance, and the replacement and collision of particles within the water flow And so on, an extreme disorder occurred. Water inhalation of a large number of air, the volume increases, the proportion of lighter, lower velocity. If many thin layers of water flow through the air at the same time, and can hit each other again and again in the air, then the flow of gas will be more pronounced, the original kinetic energy will consume more water will have to spread to a larger
其他文献
目的观察卡托普利治疗小儿血管迷走性晕厥(VS)的疗效并探讨其机制。方法34例直立倾斜试验(HUT)重复性良好的阳性VS患儿分别口服安慰剂(安慰剂组)及卡托普利(卡托普利组),1周后复查HUT;并利用荧光法测量HUT检查前后血中儿茶酚胺(CA)的浓度。结果安慰剂组17例VS患儿仅6例HUT检查转阴;卡托普利组17例均转阴。安慰剂组随访16±10个月11例中有8例VS复发,而卡托普利组随访19 ± 3
我最近参加了三門峽水电站初步設計机电审查小組,除参加审查工作外,得到了一个学習的机会。在热烈的小组討論会里,尤其在倾听苏联?掖疝q之后,在技术經驗和思想方法上,均获得
武汉长江大桥工程局采用“大型管柱鑽孔法”,短期内在“天堑”长江上建造桥墩成功,使我国桥梁建筑技术飞跃了一大步。这一世界伟大技术新的主要特点是从水上进行水下施工,使
一、概述由于水库蓄水以后引起的库岸变形将牵涉到许多国民经济建设的问题,如:铁路、耕地、居民点及建筑物均受到威协,坍岸的结果将会造成水库的补充淤积并使高程与面积容积
《摔跤吧!爸爸》上映不过四天便突破1亿大关,势头很是不错。用炸裂的口碑刷爆了朋友圈,彻底征服了中国观众,也改变了我们对印度电影“一言不合就跳舞”的偏见。英文片名:《Da
川剧是一门视觉与听觉相结合的艺术。川剧之所以经典,除去其融汇了多元的唱腔和丰富的剧目之外,还有那象征性与写意性并具的脸谱图像、完美地承袭了中国传统服饰文化的戏服以
基于迈克尔逊(Michelson)干涉仪(MI)原理,结合光纤传感器的特性,设计和实现了一种单模光纤(SMF)偏芯干涉仪结构光纤折射率传感器,并针对蔗糖溶液进行了折射率的测量。实验结
本文介绍了对适用于40~70米水头段的A112转轮在水轮机试验室内所作的模型应力试验。文章分四方面介绍:关于模型转轮的制作;关于试验原理及方法;试验结果换算公式;单位应力的概
目前,我国采用的砂石泵多按理想流体设计,效率低,气蚀性能差,真空吸上高度难以保证。例如,在国内系列产品中,真空吸上高度不超过7.0米水柱高,而且流道较窄,只能间断通过30~50
不透水地基上帶有濾水壩趾的土壩圖形示于圖1a。水从壩身流过边界CB滲入排水的滲流量按下式確定■式中 s_o——在濾水壩趾边坡上出逸段CB的長度; k_1——壩身土壤的滲透系数