论文部分内容阅读
珠江委设计院在院长的带领下,全院职工经过6年的努力拼搏,完成了白石窑水电站工程地质勘察与设计,该工程于1999年竣工验收。《白石窑水电站工程地质勘察》、《白石窑水电站工程设计》分别荣获2000
Under the leadership of the dean, Pearl River Commission Design Institute completed six years of hard work and completed the geological survey and design of the Baishiyao Hydropower Station. The project was completed and completed in 1999. “Baishiyao Hydropower Engineering Geological Survey”, “Baishiyao Hydropower Project” were awarded 2000