论文部分内容阅读
A lab scale membrane bioreactor system was built to investigate the removal of Di-2-Ethyl Hexyl Phthalates (DEHP) in wastewater under variation of three runs: two hydraulic retention time (HRT) 24 and 36 hours in addition to two biomass: concentrated and