论文部分内容阅读
介绍了乌克兰第聂伯梯级水电站的改造情况 ,通过改造 ,提高了电站的经济效益。该改造计划还具有明显的社会效益。
The reconstruction of the Dnepr Cascade Hydropower Station in Ukraine was introduced and the economic benefits of the hydropower station were improved through retrofitting. The renovation plan also has obvious social benefits.