结合金隅万科三期示范工程,对150铝框胶合板顶板模板早拆体系作了简单介绍,阐述了其组成及施工工艺流程,并在人工、用料、机械、质量保证、施工方法、经济效益、安全文明施工及环保效益方面与传统碗扣式钢管脚手架施工进行了对比分析。工程实践表明,150铝框胶合板顶板模板早拆体系能大量节省人工,采用早拆技术能大量节省材料,该体系是一种满足节能减排要求的新型低碳化模架体系。
Combined with the development of Vanke Phase III demonstration project, a brief introduction was made on the early demolition of 150 aluminum frame plywood roof formwork, and its composition and construction process flow were described. And in terms of labor, materials, machinery, quality assurance, construction methods, economic benefits , Safety and civilized construction and environmental benefits compared with the traditional bowl-type steel scaffold construction contrasted analysis. Engineering practice shows that the early demolition of 150 aluminum frame plywood roof template can save a lot of labor, and the early demolition technology can save a lot of material. The system is a new type of low carbon mold system that meets the requirements of energy saving and emission reduction.