一、概况 上海炼油厂高温催化裂化管道中的φ1070双动滑阀采用GH33镍基高温合金螺栓紧固。1987年3月10日停产检修时发现总数为22只的M20螺栓中有11只断裂,断裂处均在螺纹根部。4月初重新更换螺栓后,使用仅13天又发生因螺栓断裂,致使阀体的导轨和阀板掉落,再次被迫停产每天损失近百万元。在如此短的时间内连续发生类似的螺栓断裂事故,严重影响了该厂的生产,并造成可观的经济损失。为查明断裂原因,提出改
First, the overview Shanghai refinery high temperature catalytic cracking pipe φ1070 double-acting slide valve GH33 nickel-based high temperature alloy bolt fastening. March 10, 1987 shutdown inspection found that a total of 22 M20 bolts in the fracture 11, fracture at the root of the thread. In early April after the replacement of bolts, the use of only 13 days and the occurrence of bolt rupture, resulting in body guide rail and valve plate fell, once again forced to stop production loss of nearly 1 million yuan a day. A similar series of bolt rupture accidents occurred in such a short period of time, seriously affecting the plant’s production and causing considerable economic losses. In order to find out the reason of the fracture, put forward to change