论文部分内容阅读
随着电力工业的发展,大部分小水电站都并入大电网运行,充分发挥了小水电的效益,同时也考验了小水电的机组设备,给我们提出了许多新的问题。
With the development of the power industry, most small hydropower stations have been integrated into large power grids to give full play to the benefits of small hydropower. In the meantime, they have also tested the equipment of small hydropower plants and put forward many new problems for us.