论文部分内容阅读
法国电力公司最近与我国有关部门签订了关于珠江上游红水河河段龙滩水电枢纽设计的研究合同。该枢纽坝高200米,电站装机容量为500万千瓦。法国电力公司负责厚拱坝方案的可行性研
EDF recently signed a research contract with China’s relevant authorities on the design of Longtan Hydropower Station on the bank of the Red River in the upper reaches of the Pearl River. The hub dam is 200 meters high, power station installed capacity of 5 million kilowatts. French electric company responsible for the feasibility of thick arch dam program