论文部分内容阅读
新陆煤矿通风系统优化改造前矿井负压2940Pa,矿井总入风量8654m3/min,矿井负压大,系统的分析了矿井通风系统现状及存在的问题,并利用北京龙软的通风信息管理系统可视化平台,对新陆煤矿矿井通风系统进行通风阻力测定和通风系统的进一步优化,提出了解决方案,对矿井通风系统进行优化改造后,矿井负压2273Pa,矿井通风系统可靠性显著提高,实现矿井主通风机安全经济运行,实现了降阻增风的目标,提高矿井抗灾能力。
Before the optimization of the ventilation system of Xinlu coal mine, the mine negative pressure was 2940Pa, the total air volume of the mine was 8654m3 / min, and the negative pressure of the mine was large. The status quo and existing problems of mine ventilation system were systematically analyzed. With the help of Beijing Long soft ventilation information management system visualization Platform, the new Lu coal mine ventilation system ventilation resistance measurement and ventilation system further optimization, put forward a solution to optimize the mine ventilation system, the mine negative pressure 2273Pa, mine ventilation system reliability significantly improved to achieve the main mine Ventilator safe and economical operation, to achieve the goal of reducing resistance and increasing wind, improve mine resilience.