根据在招投标活动和工程施工中的工作实践,从业主、监理的角度对招标文件审查、工程变更认定、工程造价管理、索赔费用计算、甲供材料核销等方面做了详细的阐述,尤其强调为避免施工过程在工程变更、造价、索赔等方面产生纠纷,作为工程造价的预控手段,业主、监理应提前在招标文件专用条款审查过程中包括在合同谈判过程中加以防范和控制。
According to the practice of bidding and tendering activity and project construction, it elaborates the bidding documents examination, project alteration determination, project cost management, claim cost calculation and verification of material supply, especially from the perspective of owner and supervisor Emphasize that to avoid disputes arising from engineering changes, cost and claims in the construction process, owners and supervisors should take precautionary and control measures in the process of reviewing the exclusive terms of the bidding documents in advance during the process of contract negotiation as pre-control measures of project cost.