论文部分内容阅读
The lead time compression is the core of supply chain management with time competition and the powerful source of competitive advantage of supply chain.As an emerging technology,The Internet of things is a huge network which combined Various Information sensing device(such as RFID,infrared sensors,global position system,communication device,etc.)with internet.So it can improve information sharing,cut logistical operations time and reduce lead-time.Base on the assumption that the market demand forecast accuracy varies with lead-time,this paper will establish the inventory model of the remanufacturing/manufacturing system and give the optimization algorithms of this mode.Finally,the conclusion is validated through a numerical example,proved the practicability of the model in practice.
The lead time compression is the core of supply chain management with time competition and the powerful source of competitive advantage of supply chain. As of an emerging technology, The Internet of things is a huge network which combined Various Information sensing device (such as RFID, infrared sensors, global position system, communication device, etc.) with internet.So it can improve information sharing, cut logistical operations time and reduce lead-time. Base on the assumption that the market demand forecast accuracy varies with lead-time, this paper will establish the inventory model of the remanufacturing / manufacturing system and give the optimization algorithms of this mode. Finally, the conclusion is validated through a numerical example, proved the practicability of the model in practice.