摘要:随着改革开放的深入和市场经济的发展,建筑业取得了惊人的成绩,为国民经济的持续发展做出了巨大的贡献。桩的种类和桩基形式、施工工艺和设备以及桩基理论和设计方法,都有了很大的演进。桩基已成为在土质不良地区修建各种建筑物特别是高层建筑,重型厂房和具有特殊要求的构筑物所广泛采用的基础形式。
关键词:建筑施工;桩基础;质量研究
Abstract: With the development of reform and open policy and the market economy, the construction industry has made remarkable achievements, and made great contributions to the sustained development of the national economy. The pile types and type of pile foundation, construction technology and equipment as well as the pile foundation design theory and methodology, there are a lot of evolution. Pile foundation has become the construction of buildings in poor soil region especially in high-rise buildings, forms the basis of widely used in factories and some special requirements for structures.
Key words: building construction; pile foundation; quality research
中图分类号:TU74 文献标识码:文章编号:
1桩基础的简析
桩基又叫桩基础,是工程建筑基础中的一种,由基桩和联接于桩顶的承台共同组成,桩基主要的作用是负责把荷载转给持力层。分为低承台桩基和高承台桩基;低承台桩基的桩身全部埋于土中,承台底面与土体接触;高承台桩基的桩身上部露出地面而承台底位于地面以上。建筑桩基通常为低承台桩基础。桩基础是一种深基础,它具有稳定性好、承载力高、沉降量小而均匀、良好的抗震性能、沉降稳定快等优点,因此在各类建筑工程中得到广泛应用,尤其在高层建筑中,桩基础应用广泛。
2 桩基处理的一般原则 当桩基发生质量问题后,若处理不及时,结果给工程留下隐患。为了防止类似问题的发生,处理方法如下:
2.1 处理前应具备的条件。 事故性质和范围清楚;目的要明确,应有预定处理方案。
2.2 事故处理应满足的基本条件 对事故处理方案要求安全可靠、经济合理。对未施工部分应提出预防和改进措施,防止事故的再次发生。
2.3事故应及时处理,防止留下隐患 桩成孔后,应检查桩孔嵌入持力层深度、岩石强度、沉渣厚度、桩孔垂直度等数据必须符合设计要求,只要有一项不符合设计要求,就应及时分析解决,方能灌注砼、移动钻机,防止类似问题产生造成不必要的浪费。 基桩开挖前必须全面检查成桩记录和桩的测试资料,发现质量上问题,必须经研究后方能挖土,防止基桩开挖后再来处理造成不必要的麻烦。
2.4 应考虑事故处理对已完成工程质量和后续工程的质量和后续工程的影响 如在事故处理中采取补桩时,应考虑会不会损坏混凝土强度和较低的邻近桩。
3 桩基础施工的技术分析
3.1施工顺序要合理合理的施工顺序,能减少施工难度,所以,在施工方案中要认真统筹,依据实际情况合理安排在可能的条件下,应先施工外围桩孔,这部分桩孔混凝土护壁完成后,可保留少量桩孔先不浇筑桩身混凝土,而做为排水井,以方便其它孔位的施工,从而保证了桩孔的施工速度和成孔质量。3.2桩基施工的技术细节
3.2.1施工时,如果桩身内部的混凝土强度与预先设计的强度相符时,应该将桩静置而且经过蒸汽的养护之后方可施工;在进行沉桩的施工时,利用经纬仪严格的测量,使桩应该保持垂直,误差不超过0.5%,因为偏差较大时,会导致桩身容易开裂。
3.2.2进行接桩的操作施工时,接桩通常采用钢端板焊接的方式,在桩身离地面一米的距离时即可进行焊接、接桩时要时刻观察两节桩身的衔接情况,保证圆角和直角相互正对,在桩顶清理干净之后要进行定位板固定,接着再将上段的桩吊放在下段桩的端板上,利用定位板将上下段的桩接直,如果在两段桩的衔接处有空隙,要利用锲形的铁片加以焊接固定。接头处坡口槽电焊应分三层对称进行,焊接时应减小焊接变形,焊缝连续饱满;焊后清除焊渣,检查焊缝饱满程度焊接完成后应等接头温度与周围环境温差在100以内才能沉桩,一般情况下静压桩等候6分钟锤击桩等候8分钟为宜,不得用水淋等方式快速冷却。
3.2.3在桩冒和送桩器的选择上,要保持外形上的相互匹配,而且在强度和刚度等的选取上也一定要合格,桩冒和送桩器的下端应该采用开孔的方式来加强桩内部同外界的互通性能,尽量使得每次沉桩的操作都一次到底,避免中间的出现的短暂性停歇;在沉桩的过程中,如果出现贯入度不正常,桩身出现略微的偏差或位移时,为了避免桩身或者桩顶的损坏应立即停止沉桩,通过分析出现这种情况的原因并且加以解决,接着方可继续施工。
3.2.4对于空心桩一般不进行截桩的操作,如果遇到特殊的情况必须要截桩时,应该采用机械分割的方法将无需截掉的那部分桩身加以固定,然后再沿着钢箍的上边缘进行切割,钢箍绝对不可以利用人力进行强行的截除,可以利用气割法进行切割。
4桩基础施工中易存在的问题
4.1桩基础可能出现的缺陷: ①桩基顶部缺陷。在水下浇筑混凝土时会有泥浆的沉淀,对于泥浆的厚度很难做到准确测定,如果超灌桩顶的混凝土不足,就会出现夹泥的现象而影响了混凝土质量;再者在浇筑混凝土完成后,因不均衡地用力或过度用力而对钢护筒进行预埋和拆拔,就会干扰到桩顶的混凝土,以至于破坏混凝土质量。最后,因使用较大功率的风镐来凿除混凝土桩头,在一定程度上会扰动声测管周围的混凝土,对混凝土质量造成影响。②桩基中部缺陷。在混凝土的灌注中可能会因勘探的失误造成因较差的地质条件而导致局部的发生塌孔,使混凝土的翻浆受到阻碍,以至于引起局部的缺陷。另外,如果过度的用力拆拔导管,混凝土受到連续性的扰动,混凝土质量也会受到影响。再者由于导管的气密性较差,在水下灌注混凝土时导管会插入到泥浆中,这就造成导管内外压强的不均衡,造成混凝土的质量的受到影响,更严重的可能使混凝土的下料受阻碍,不能正常进行翻浆,以至于引起断桩。
4..2单桩承载力低于设计要求 单桩的承载力不符合设计要求主要是由于桩未达到设计的沉入深度;最终的贯入量过大以及桩的顶端未没有进入设计要求的持力层,但桩已进入到设计的深度;勘察报告所提供的地基承载力、地层剖面等数据与实际情况存在较大的差距,还有其他的原因如桩倾斜过大、断裂等也会导致单桩的承载力不能达到设计要求。
4.3桩倾斜过大 由于预制桩的质量不符标准,导致桩顶面倾斜和桩尖的位置不正或者变形,从而造成桩倾斜;桩身、桩帽、桩锤的中心线偏离,导致锤击偏离了重心;桩机安装的角度不准确,造成桩架与地面的不垂直;桩端遇到坚硬的障碍物;桩距过小,错误的打桩顺序导致强烈的挤土效应产生;基坑土方开挖不当、测量放线错误等都会造成桩倾斜过大。
4.4断桩 除了桩倾斜过大会导致桩断裂外,由于桩运输、起吊、堆放的吊点或支点位置出现偏差;在沉桩的过程中,因桩的质量或者障碍物的阻碍等原因导致桩身因过度的弯曲;。设计要求的桩锤击与设计的贯入度存在较大误差,以致于施工时锤击次数过多、锤击过度导致桩断裂。 4.5桩接头断裂 在桩需要设计的较长时,在施工工艺上,桩采用分段预制、分段沉入的方法,各段之间用钢制焊接连接件进行连接。导致桩接头断离现象其原因主要是桩倾斜过大,另外桩上下节的中心线偏离,桩接头施工技术不达标、质量差也是重要原因。
4.6桩位偏差过大 造成桩的位置偏差主要是由于测量放线的差错、沉桩工艺落后及桩身倾斜等原因造成。
6 建筑工程桩基础施工要点
5.1 预制桩入土深度不足时,或打入桩因土体隆起将桩上抬时,均可采用补沉法。
5.2桩基承台前补桩当桩距较小时,可采用先钻孔,后植桩,再沉桩的方法;桩基承台或地下室完成再补静压桩。此法的优点是可以利用承台或地下室结构承受静压桩反力,设施简单,不延长工期。
5.3当打入桩采用分节连接,逐根沉入时,差的接樁可能发生连接节点脱开的情况,此时可采用送补结合法。①是对有疑点的桩复打,使其下沉,把松开的接头再拧紧,使之具有一定的竖向承载力;②适当补些全长完整的桩,一方面补足整个基础竖向承载力的不足,另一方面补充整桩的可承受地震荷载。
5.4桩身倾斜,但未断裂,且桩长较短,或因基坑开挖造成桩身倾斜,而未断裂,可采用局部开挖后用千斤顶纠偏复位法处理。
5.5 修改桩型或沉桩参数。①如预制方桩改为预应力管桩等。②预制桩过程中遇到较厚的密实粉砂或粉土层,出现桩下沉困难,甚至发生断桩事故,此时可整理采用缩短桩长,增加桩数量,取密实的粉砂层作为持力层。③如沉桩中遇到坚硬的、不大的地下障碍物,使桩产生倾斜,甚至断裂时,可采用改变桩位重新沉桩。④当桩沉入深度达不到设计要求时,可采用大吨位桩架,采用重锤低击法沉桩。
6 结束语
作为建筑工程的总要组成部分,其桩基础工程的施工质量对建筑工程施工质量有着重要的影响。因此,应加强对桩基础施工技术的改进,才能保障桩基础工程施工质量。我们只有引以为诫,防微杜渐,从点滴做起,严格把握从设计到施工质量控制当中的每一个环节,消除质量隐患,就能够杜绝质量事故,保证工程质量。
参考文献
[1]张跃川.桩基工程施工方案编制[J].工程建设与设计,2009,12
[2]张毅,张文君.桩基工程成孔质量检测技术探讨[J].现代商贸工业,2009.19
[2]刘金砺.桩基础设计施工与检测[M].北京:中国建材工业出版社.2001.
关键词:建筑施工;桩基础;质量研究
Abstract: With the development of reform and open policy and the market economy, the construction industry has made remarkable achievements, and made great contributions to the sustained development of the national economy. The pile types and type of pile foundation, construction technology and equipment as well as the pile foundation design theory and methodology, there are a lot of evolution. Pile foundation has become the construction of buildings in poor soil region especially in high-rise buildings, forms the basis of widely used in factories and some special requirements for structures.
Key words: building construction; pile foundation; quality research
中图分类号:TU74 文献标识码:文章编号:
1桩基础的简析
桩基又叫桩基础,是工程建筑基础中的一种,由基桩和联接于桩顶的承台共同组成,桩基主要的作用是负责把荷载转给持力层。分为低承台桩基和高承台桩基;低承台桩基的桩身全部埋于土中,承台底面与土体接触;高承台桩基的桩身上部露出地面而承台底位于地面以上。建筑桩基通常为低承台桩基础。桩基础是一种深基础,它具有稳定性好、承载力高、沉降量小而均匀、良好的抗震性能、沉降稳定快等优点,因此在各类建筑工程中得到广泛应用,尤其在高层建筑中,桩基础应用广泛。
2 桩基处理的一般原则 当桩基发生质量问题后,若处理不及时,结果给工程留下隐患。为了防止类似问题的发生,处理方法如下:
2.1 处理前应具备的条件。 事故性质和范围清楚;目的要明确,应有预定处理方案。
2.2 事故处理应满足的基本条件 对事故处理方案要求安全可靠、经济合理。对未施工部分应提出预防和改进措施,防止事故的再次发生。
2.3事故应及时处理,防止留下隐患 桩成孔后,应检查桩孔嵌入持力层深度、岩石强度、沉渣厚度、桩孔垂直度等数据必须符合设计要求,只要有一项不符合设计要求,就应及时分析解决,方能灌注砼、移动钻机,防止类似问题产生造成不必要的浪费。 基桩开挖前必须全面检查成桩记录和桩的测试资料,发现质量上问题,必须经研究后方能挖土,防止基桩开挖后再来处理造成不必要的麻烦。
2.4 应考虑事故处理对已完成工程质量和后续工程的质量和后续工程的影响 如在事故处理中采取补桩时,应考虑会不会损坏混凝土强度和较低的邻近桩。
3 桩基础施工的技术分析
3.1施工顺序要合理合理的施工顺序,能减少施工难度,所以,在施工方案中要认真统筹,依据实际情况合理安排在可能的条件下,应先施工外围桩孔,这部分桩孔混凝土护壁完成后,可保留少量桩孔先不浇筑桩身混凝土,而做为排水井,以方便其它孔位的施工,从而保证了桩孔的施工速度和成孔质量。3.2桩基施工的技术细节
3.2.1施工时,如果桩身内部的混凝土强度与预先设计的强度相符时,应该将桩静置而且经过蒸汽的养护之后方可施工;在进行沉桩的施工时,利用经纬仪严格的测量,使桩应该保持垂直,误差不超过0.5%,因为偏差较大时,会导致桩身容易开裂。
3.2.2进行接桩的操作施工时,接桩通常采用钢端板焊接的方式,在桩身离地面一米的距离时即可进行焊接、接桩时要时刻观察两节桩身的衔接情况,保证圆角和直角相互正对,在桩顶清理干净之后要进行定位板固定,接着再将上段的桩吊放在下段桩的端板上,利用定位板将上下段的桩接直,如果在两段桩的衔接处有空隙,要利用锲形的铁片加以焊接固定。接头处坡口槽电焊应分三层对称进行,焊接时应减小焊接变形,焊缝连续饱满;焊后清除焊渣,检查焊缝饱满程度焊接完成后应等接头温度与周围环境温差在100以内才能沉桩,一般情况下静压桩等候6分钟锤击桩等候8分钟为宜,不得用水淋等方式快速冷却。
3.2.3在桩冒和送桩器的选择上,要保持外形上的相互匹配,而且在强度和刚度等的选取上也一定要合格,桩冒和送桩器的下端应该采用开孔的方式来加强桩内部同外界的互通性能,尽量使得每次沉桩的操作都一次到底,避免中间的出现的短暂性停歇;在沉桩的过程中,如果出现贯入度不正常,桩身出现略微的偏差或位移时,为了避免桩身或者桩顶的损坏应立即停止沉桩,通过分析出现这种情况的原因并且加以解决,接着方可继续施工。
3.2.4对于空心桩一般不进行截桩的操作,如果遇到特殊的情况必须要截桩时,应该采用机械分割的方法将无需截掉的那部分桩身加以固定,然后再沿着钢箍的上边缘进行切割,钢箍绝对不可以利用人力进行强行的截除,可以利用气割法进行切割。
4桩基础施工中易存在的问题
4.1桩基础可能出现的缺陷: ①桩基顶部缺陷。在水下浇筑混凝土时会有泥浆的沉淀,对于泥浆的厚度很难做到准确测定,如果超灌桩顶的混凝土不足,就会出现夹泥的现象而影响了混凝土质量;再者在浇筑混凝土完成后,因不均衡地用力或过度用力而对钢护筒进行预埋和拆拔,就会干扰到桩顶的混凝土,以至于破坏混凝土质量。最后,因使用较大功率的风镐来凿除混凝土桩头,在一定程度上会扰动声测管周围的混凝土,对混凝土质量造成影响。②桩基中部缺陷。在混凝土的灌注中可能会因勘探的失误造成因较差的地质条件而导致局部的发生塌孔,使混凝土的翻浆受到阻碍,以至于引起局部的缺陷。另外,如果过度的用力拆拔导管,混凝土受到連续性的扰动,混凝土质量也会受到影响。再者由于导管的气密性较差,在水下灌注混凝土时导管会插入到泥浆中,这就造成导管内外压强的不均衡,造成混凝土的质量的受到影响,更严重的可能使混凝土的下料受阻碍,不能正常进行翻浆,以至于引起断桩。
4..2单桩承载力低于设计要求 单桩的承载力不符合设计要求主要是由于桩未达到设计的沉入深度;最终的贯入量过大以及桩的顶端未没有进入设计要求的持力层,但桩已进入到设计的深度;勘察报告所提供的地基承载力、地层剖面等数据与实际情况存在较大的差距,还有其他的原因如桩倾斜过大、断裂等也会导致单桩的承载力不能达到设计要求。
4.3桩倾斜过大 由于预制桩的质量不符标准,导致桩顶面倾斜和桩尖的位置不正或者变形,从而造成桩倾斜;桩身、桩帽、桩锤的中心线偏离,导致锤击偏离了重心;桩机安装的角度不准确,造成桩架与地面的不垂直;桩端遇到坚硬的障碍物;桩距过小,错误的打桩顺序导致强烈的挤土效应产生;基坑土方开挖不当、测量放线错误等都会造成桩倾斜过大。
4.4断桩 除了桩倾斜过大会导致桩断裂外,由于桩运输、起吊、堆放的吊点或支点位置出现偏差;在沉桩的过程中,因桩的质量或者障碍物的阻碍等原因导致桩身因过度的弯曲;。设计要求的桩锤击与设计的贯入度存在较大误差,以致于施工时锤击次数过多、锤击过度导致桩断裂。 4.5桩接头断裂 在桩需要设计的较长时,在施工工艺上,桩采用分段预制、分段沉入的方法,各段之间用钢制焊接连接件进行连接。导致桩接头断离现象其原因主要是桩倾斜过大,另外桩上下节的中心线偏离,桩接头施工技术不达标、质量差也是重要原因。
4.6桩位偏差过大 造成桩的位置偏差主要是由于测量放线的差错、沉桩工艺落后及桩身倾斜等原因造成。
6 建筑工程桩基础施工要点
5.1 预制桩入土深度不足时,或打入桩因土体隆起将桩上抬时,均可采用补沉法。
5.2桩基承台前补桩当桩距较小时,可采用先钻孔,后植桩,再沉桩的方法;桩基承台或地下室完成再补静压桩。此法的优点是可以利用承台或地下室结构承受静压桩反力,设施简单,不延长工期。
5.3当打入桩采用分节连接,逐根沉入时,差的接樁可能发生连接节点脱开的情况,此时可采用送补结合法。①是对有疑点的桩复打,使其下沉,把松开的接头再拧紧,使之具有一定的竖向承载力;②适当补些全长完整的桩,一方面补足整个基础竖向承载力的不足,另一方面补充整桩的可承受地震荷载。
5.4桩身倾斜,但未断裂,且桩长较短,或因基坑开挖造成桩身倾斜,而未断裂,可采用局部开挖后用千斤顶纠偏复位法处理。
5.5 修改桩型或沉桩参数。①如预制方桩改为预应力管桩等。②预制桩过程中遇到较厚的密实粉砂或粉土层,出现桩下沉困难,甚至发生断桩事故,此时可整理采用缩短桩长,增加桩数量,取密实的粉砂层作为持力层。③如沉桩中遇到坚硬的、不大的地下障碍物,使桩产生倾斜,甚至断裂时,可采用改变桩位重新沉桩。④当桩沉入深度达不到设计要求时,可采用大吨位桩架,采用重锤低击法沉桩。
6 结束语
作为建筑工程的总要组成部分,其桩基础工程的施工质量对建筑工程施工质量有着重要的影响。因此,应加强对桩基础施工技术的改进,才能保障桩基础工程施工质量。我们只有引以为诫,防微杜渐,从点滴做起,严格把握从设计到施工质量控制当中的每一个环节,消除质量隐患,就能够杜绝质量事故,保证工程质量。