深化改革 不断提高地质测绘工作的经济效益

来源 :中国地质 | 被引量 : 0次 | 上传用户:caicai432111
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
地矿部系统测绘工作在改革、开放、搞活的方针指引下开始从封闭走向开放;在管理工作上由以行政手段为主的直接控制,开始转向以经济手段为主的间接控制;在所有权与经营权的分离上作了有益的探索.以相对独立的测绘成果、成图生产者和经营者的身份走上社会测绘市场,社会效益和经济效益不断增长.8年来,25个省、市、区地矿 The system mapping work of the Ministry of Geology and Mineral Resources began to move from closed to open under the guideline of reform, opening up, and invigoration; in the management work, direct control based on administrative measures began to turn to indirect control based on economic means; The exploration of the separation of management rights has made beneficial explorations. Taking the position of relatively independent surveying and mapping achievements, graphic producers and operators, we embarked on the social surveying and mapping market, and the social and economic benefits have continuously increased. Over the past eight years, 25 provinces, cities, and District mines
其他文献
进入八十年代以来,作为香港经济主要支柱的工业,面临着新的困难与挑战,正逐步向“以高增值和高科技为本”的方向转变。认真分析香港工业的现状及遇到的困难,进一步分析香港
湖南省轴承制造工业协会成立于1987年6月,在湖南省机械工业厅和上级协会的支持与指导下,为省内轴承行业作了一些工作,得到各企业的好评。现将一年来的工作及其体会汇报如下,
【《欧洲核能》1988年8—9月号第12页报道】不论为从后处理到最终处置的核燃料循环的后段选择怎样的方案,全世界的电力公司都必须解决燃料的中间贮存问题。理想的贮存设施必
引言美国海军在50个州、波多黎各、关岛和菲律宾的高地震危险区域中拥有55个大的基地,以及分散的小机构。这包括公用事业设备、道路、桥梁、水坝以及超过14,000幢大型建筑物
迄今为止,法国电力公司订购的34座900MWe压水堆已并网运营;订购的20座1300MWe级压水堆中,有 9座堆的发电机组也已并网运营;此外,还有 2座 N4型1400MWe的压水堆核电站在建造
购就送:中、高考研究专家组考点讲解视频与幻灯片!再送:最近三年中、高考真题解析和语文、英语满分作文!!再送:一轮、二轮复习考点梳理名师精品资料!!!为了让大家轻松备战高
新机构、新职能.新成立的地质勘查管理司的工作任务是什么?根据地矿部今后的工作职能重点主要是从事行业管理的要求,地质勘查管理司的主要职能有四个方面:一是组织制定地质勘
法国的家具产量位于欧洲第三,尽管法国方面很努力,却仍未赶上意大利和西德。而西班牙正迈着大步向居第四位的英国靠近,并有取而代之之势。不过近几年法国国内的家具市场形势
我国电力工业长期落后于国民经济发展的需要,至今没有摆脱被动的缺电局面,和各行各业生产能力相比较,全国大约缺电1000万瓩、500亿度左右,影响工农业产值20%以上。从微观来
根据机械工业部电机字154号文关于建立第一批电工产品检测中心的通知和机械工业部电器工业局(85)电质字第202号文关于第二批电工产品检测中心挂牌刻章的通知的要求,“中国电