The PGNAA facility consists of the filtered collimated neutron beam, the shielding of the whole facility, the control system, the detecting equipment and the da
The year 2011 is featured with several important events for the Beijing Radioactive Ion-beam Facility (BRIF) project. At the beginning of the year, the two divi
1 Test stand of high current H- ion source and beam pulsing injection line The study on high current H- ion source and beam pulsing injection line involves many