按照《建筑工程冬期施工规程》(JGJ104—97)规定,当室外日平均气温连续5d稳定低于5℃即进入冬期施工,在工程建设施工过程中,受自然气候的影响,加之工程建设的进度需要,有时不可避免的要进行冬期施工,若采取的措施不当,会给工程带来不利的影响,极易给工程质量造成隐患或出现质量事故,本文就冬期施工选择合理的控制措施,编制切实可行的施工方案以及施工过程中应注意的问题进行探讨和研究。
In accordance with the provisions of the “Winter Construction Procedures for Construction Engineering” (JGJ104-97), when the outdoor daily average temperature is stable below 5 ℃ for 5 consecutive days, it will enter winter construction. During construction and construction, affected by the natural climate and the progress of construction Necessary, and sometimes inevitable to winter construction, if taken improper measures, will bring adverse effects to the project, easy to cause hidden dangers or quality of project quality accidents, this article on winter construction choose reasonable control measures, the preparation of practical Feasible construction plan and the problems that should be paid attention to in the process of construction are discussed and studied.