第一讲工程竣工档案组卷顺序一、组卷原则基本建设工程档案的整理组卷,必须按照基本建设程序,遵循工程竣工档案的自然形成规律,保持卷内基本建设文件、设计、施工、施工图纸之间的有机联系的原则。按性质和形成时间的先后加以系统排列,组成案卷,二、文件排列顺序(参照黑龙江省质量监督总站下发的省标)(一)甲方文件:1、工程彩色照片,录像磁带,录音磁带(拆迁前的旧貌,施工中、竣工后)。
Lecture on the completion of the first volume of the project file volume sequence First, the principle of the compilation of the basic construction project file compilation and compilation of volumes must be in accordance with the basic construction procedures, follow the natural formation of the completion of the archives of the law to maintain the volumes of capital construction documents, design, construction and construction The principle of organic connection between drawings. According to the nature and time of formation, systematic arrangement shall be made to form the case file. Second, the order of the documents shall be arranged (refer to the provincial standard issued by Heilongjiang Quality Supervision Station). Party A Documents: 1. Color photographs, video tapes and audio tapes (Before the demolition of the old appearance, construction, after completion).